Permit Information
Permit NumberBLD17-03755
StatusFinaled
Name MORGAN CONSTRUCTION
Site Address 1529 S TIMESQUARE LN
Project NameTimes Square Dental
Customer Number 
ePlanReviewYes
Description
(TIMES SQUARE DENTAL) **This building is not Fire Sprinklered. Permit is to expand an existing dental office into the adjacent 1,200 sq ft tenant space creating a single 3,672 sq ft tenant space. Work is to be done in three phases while the building remains occupied. Exit access is to be maintained at all times during construction. Work to include: demolishing a portion of the demising wall and interior non-bearing wall; new sinks, and cabinetry; new non-bearing interior walls and door, cabinetry; new plumbing; new electrical; and new interior finishes in compliance with Ch. 8 of the 2012 IBC. All work to be done per the approved plans and applicable codes and ordinances. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/22/20183/23/20183/23/2018PPASS
DetailsMike Jordan
Please contact JP ###-#### Phone #: ###-#### Inspection requested via web by Mattie Botero
DOC - Permit Finaled3/23/20183/23/20183/23/2018PPASS
DetailsMike Jordan
FIRE-Final Inspection3/22/20183/23/20183/23/2018APASS
DetailsJim Page
Only fire sprinkler in tenant space is in gas closet (gas closet is existing, room appears to be rated with a self closing door, tanks are sucure), no other fire sprinklers, no fire alarms, fire extinguishers are in place and will be tagged with current inspection tags. Final life fire safety inspection for area of work complete.
BLD-Ceiling Grid Inspection3/19/20183/20/20183/20/2018PPASS
DetailsMike Jordan
Please contact JP at ###-#### Phone #: ###-#### Inspection requested via web by Mattie Botero.
BLD-Framing/Rough-in2/20/20182/21/20182/21/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Mattie Botero. Interior wood framed walls and soffit for new entry and admin. area.
BLD-Framing/Rough-in2/16/20182/20/20182/20/2018ACANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Mattie Botero Inspection cancelled from web by: Scott Hawker
BLD-Ceiling Grid Inspection2/8/20182/9/20182/9/2018APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Mattie Botero
BLD-Framing/Rough-in1/4/20181/5/20181/5/2018APART
DetailsMike Jordan
Contact is JP ###-#### Phone #: ###-#### Inspection requested via web by Mattie Botero. Interior wood framed walls and soffits for phase 2 ok, pend. electrical rough in inspection.
BLD-Ceiling Grid Inspection12/19/201712/20/201712/20/2017APASS
DetailsMike Jordan
Please contact Scott in advance. ###-####. Please enter the building through the door on the South end. Thanks. Phone #: ###-#### Inspection requested via web by Mattie Botero
BLD-Ceiling Grid Inspection12/18/201712/19/201712/19/2017ANR
DetailsMike Jordan
Please call Scott in advance. ###-####. Enter building through the door on the North side. Thank you. Phone #: ###-#### Inspection requested via web by Mattie Botero. Need electrical roughin inspection. Electrical was not ready.
BLD-Other11/28/201711/29/201711/28/2017APASS
DetailsMike Jordan
Insulation inspection. Contact is JP ###-#### Phone #: ###-#### Inspection requested via web by Mattie Botero
BLD-Energy code compliance11/28/201711/28/201711/28/2017PPASS
DetailsMike Jordan
Insulation inspection. Contact is JP ###-#### Phone #: ###-#### Inspection requested via web by Mattie Botero
BLD-Framing/Rough-in11/17/201711/20/201711/20/2017APASS
DetailsMike Jordan
J.P is contact. Phone #: ###-#### Inspection requested via web by Mattie Botero. Interior wood framed wals and soffits for phase 1 ok.
BLD-Framing/Rough-in11/13/201711/14/201711/14/2017ANR
DetailsMike Jordan
Jp Phone #: ###-####. Needs plumbing rough in inspection. Needs to pull electrical permit and rough in inspection.