BLD-Final | 5/4/2018 | 5/4/2018 | 5/4/2018 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 5/4/2018 | 5/4/2018 | 5/4/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 5/3/2018 | 5/4/2018 | 5/4/2018 | A | CANC |
Mike Jordan
|
|
|
Cody Phone #: ###-####
|
FIRE-Final Inspection | 5/3/2018 | 5/4/2018 | 5/3/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Per verbal agreement the existing red fire lane painting will be extended to the west end of the building complex next week when stripping occurs. Cody Phone #: ###-####
|
BLD-Conference | 3/7/2018 | 3/7/2018 | 3/7/2018 | P | DONE |
Troy Cobbley
|
|
|
It appears that coverage is missing in the entry vestible that was constructed during the shell phase of this project. Coverage is still missing under the stair.
|
BLD-Final | 2/13/2018 | 2/14/2018 | 2/14/2018 | P | PART |
Mike Jordan
|
|
|
late PM please // Cody Phone #: ###-####. Vanilla TI ok for Temp occ. until the sheel and core and facade are completed and life safety signs perm.
|
FIRE-Final Inspection | 2/13/2018 | 2/14/2018 | 2/14/2018 | A | PART |
Troy Cobbley
|
|
|
A temporary for life safety is being given with Scott's approval until the exit discharge light is installed at the main exit and sprinkler protection is provided under the new stairs to the mezzanine.
Cody Phone #: ###-####
|
BLD-Final | 2/13/2018 | 2/13/2018 | 2/13/2018 | P | NR |
Mike Jordan
|
|
|
CODY JONES Phone #: ###-####
|
FIRE-Final Inspection | 2/13/2018 | 2/13/2018 | 2/13/2018 | P | FAIL |
Troy Cobbley
|
|
|
Provide city approved plans and notes, provide installation that matches the approved plans such as fire extinguisher layout and exit signs and emergency lights and exit discharge lights. Exit discharge lights can not be on timer or photo sensor.
CODY JONES Phone #: ###-####
|
FIRE-Final Inspection | 1/30/2018 | 1/31/2018 | 2/1/2018 | P | FAIL |
Troy Cobbley
|
|
|
Need plans for inspection, address and exit discharge light
|
BLD-Final | 1/30/2018 | 1/31/2018 | 1/31/2018 | P | NR |
Mike Jordan
|
|
|
Egor Phone #: ###-####
|
BLD-Framing/Rough-in | 1/29/2018 | 1/30/2018 | 1/30/2018 | P | PASS |
Mike Jordan
|
|
|
Byern Phone #: ###-####. Interior steel stud framed walls for new vestibule. Steel column and header wrap(2layers type X Dense glass for hr. rating on exterior at new store front opening.)
|