Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD17-03779
StatusFinaled
Name BLACKROCK HOMES LLC
Site Address 7102 E HIGHLAND VALLEY RD
Project NameMontage B
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 2,465 sq. ft., two story (first story 912 sq. ft., second story 1,552 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 96 sq. ft. of covered patio/porch and a 826 sq. ft. attached garage per the approved plans, engineering, any notations, & local code. R-1C/DA zoning and setbacks per planning. Separate electrical, plumbing & mechanical permits required. **JAB**

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/28/20188/29/20188/29/2018APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
DOC - Permit Finaled8/29/20188/29/20188/29/2018PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results8/28/20188/29/20188/29/2018ADONE
DetailsBrandon Shaw
ACH50- 4.6
BLD-Blower Door Test Results8/23/20188/24/20188/24/2018ACANC
DetailsBrandon Shaw
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
BLD-Final8/23/20188/24/20188/24/2018ACANC
DetailsBrandon Shaw
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
BLD-Energy code compliance5/20/20185/22/20185/22/2018APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in5/16/20185/18/20185/18/2018APASS
DetailsBrandon Shaw
OK to insulate
BLD-Other4/24/20184/24/20184/24/2018PPASS
DetailsBrandon Shaw
Luna-soffits Phone #: ###-####
BLD-Wall cover4/24/20184/24/20184/24/2018PPASS
DetailsBrandon Shaw
Luna Phone #: ###-####
BLD-Foundation2/12/20182/12/20182/12/2018PPASS
DetailsJim Storey
Wall // Ryan Phone #: ###-####
BLD-Footing2/7/20182/8/20182/8/2018APASS
DetailsBrandon Shaw
Work in progress