BLD-Final | 1/23/2019 | 1/24/2019 | 1/24/2019 | A | PASS |
Jim Sly
|
|
|
Clive Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 1/14/2019 | 1/14/2019 | 1/14/2019 | P | PASS |
Troy Cobbley
|
|
|
life safety passed. Panic hardware has been provided on the south east door and the southwest door hardware has been removed.
|
BLD-Final | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | CANC |
Jim Sly
|
|
|
|
BLD-Final | 11/16/2018 | 11/19/2018 | 11/19/2018 | A | PART |
Jim Sly
|
|
|
Carson Phone #: ###-#### OK for Temp Occ. OK for Perm Occ. when Elevator to mezzanine installed, .......CDHD, and Fire signs off Perm. Zoning and Public Works N/A.
|
FIRE-Final Inspection | 11/16/2018 | 11/19/2018 | 11/19/2018 | A | PART |
Troy Cobbley
|
|
|
The temporary has been extended to the 30th of this month so that the panic hardware can get installed and the other hardware removed.
Carson Phone #: ###-####
|
BLD-Final | 11/16/2018 | 11/16/2018 | 11/16/2018 | P | PART |
Jim Sly
|
|
|
OK for Temp Occ. OK for Perm Occ. when..........Fire, CDHD and Zoning signs off Perm Occ. Public Works N/A
|
FIRE-Final Inspection | 11/16/2018 | 11/16/2018 | 11/16/2018 | P | PART |
Troy Cobbley
|
|
|
A temporary until Monday is ok so that panic hardware can be installed on the front/east side doors. Hardware to be removed from the front/west side doors. Building inspector and I discussed this as well as plan review (Carl). All other life safety items, fire sprinkler and fire alarm are passed.
Carson Phone #: ###-####
|
FIRE-Final Inspection | 11/2/2018 | 11/5/2018 | 11/5/2018 | A | FAIL |
Troy Cobbley
|
|
|
Not ready for final. Todays final was for approval for cover of the platform. It appears to have been completely filled with insulation and is ok for cover.
Clive Phone #: ###-####
|
FIRE-Final Inspection | 10/31/2018 | 11/1/2018 | 11/1/2018 | A | FAIL |
Troy Cobbley
|
|
|
Not ready for final yet. The project related fire alarm and fire sprinkler permits need addressed and the non-combustible insulation filling the raised platform needs to be completed and inspected.
Clive Phone #: ###-####
|
BLD-Framing/Rough-in | 10/17/2018 | 10/17/2018 | 10/17/2018 | P | PASS |
Jim Sly
|
|
|
Clive Phone #: ###-#### Platforms Ramp, Stairs.
|
FIRE-Conference | 6/26/2018 | 6/27/2018 | 6/27/2018 | A | DONE |
Troy Cobbley
|
|
|
We discussed the placement of the emergency lights.
Junior Phone #: ###-####
|
BLD-Framing/Rough-in | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | PASS |
Jim Sly
|
|
|
Clive Phone #: ###-####
|
BLD-Framing/Rough-in | 6/4/2018 | 6/5/2018 | 6/5/2018 | A | PASS |
Jim Sly
|
|
|
Clive---around 10 am or after would be best Phone #: ###-####
|
BLD-Conference | 5/18/2018 | 5/18/2018 | 5/18/2018 | P | DONE |
Troy Cobbley
|
|
|
We went over sprinkler protection under the raised platforms (I deferred them to a sprinkler contractor for guidance and showed NFPA 13 code references), We went over fire alarm requirements which appear to require full notification due to an A3 occupancy with two A3 occupant loads of 321 and 81. We also discussed having the plans match the actual field conditions ( doors are shown on the plans that they want to delete). Also there is an ageing permit for sprinkler work that has never been inspected for this space that will need to be finaled prior to a final for this tenant.
Clive- need a conference on fire issues Phone #: ###-####
|
FIRE-Final Inspection | 4/17/2018 | 4/17/2018 | 4/17/2018 | P | FAIL |
Troy Cobbley
|
|
|
Project is not ready for a final. Todays inspection was a conference with the electrician about the placement of exit signs and emergency lights. There were no approved plans on site so there was not much I could do. I met with one of the owners and let him know that I would not be signing off untill the aging permit FIR12-004
74 was finaled.
Dale Campbell Jr. Phone #: ###-####
|
BLD-Footing | 3/2/2018 | 3/5/2018 | 3/5/2018 | A | PASS |
Jim Sly
|
|
|
interior footings - Clive Phone #: ###-####
|
BLD-Footing | 3/1/2018 | 3/2/2018 | 3/2/2018 | P | PASS |
Jim Sly
|
|
|
Cliv or JR Phone #: ###-####
|