BLD-Final | 4/11/2018 | 4/13/2018 | 4/13/2018 | A | PASS |
Jim Storey
|
|
|
Patrick Phone #: ###-#### fiaal ok no card on site
|
FIRE-Final Inspection | 4/12/2018 | 4/12/2018 | 4/12/2018 | P | PASS |
Jim Page
|
|
|
Previously noted items have been addressed, final life fire safety inspection passed/complete.
|
FIRE-Final Inspection | 2/26/2018 | 2/27/2018 | 2/27/2018 | A | PART |
Troy Cobbley
|
|
|
A temporary for life safety is being given until the permanant address is provided and the fire extinguisher is mounted with current tag as discussed.
Chris Phone #: ###-####
|
BLD-Final | 2/26/2018 | 2/26/2018 | 2/26/2018 | P | PART |
Jim Storey
|
|
|
Jason Phone #: ###-#### need address # and fire insp. per aproved plan
|
BLD-Framing/Rough-in | 2/20/2018 | 2/20/2018 | 2/20/2018 | P | PASS |
Brandon Shaw
|
|
|
Thru beam at 2hr wall, fire caulking in place Thru Trusses at 2hr wall, packed with mineral wool and to be fire caulked
|
BLD-Conference | 2/5/2018 | 2/6/2018 | 2/6/2018 | A | PART |
Jim Storey
|
|
|
Jason Phone #: ###-#### soffits ok/2 hr fire sepetration as per aproved plans wip
|