BLD-Final | 5/29/2018 | 5/30/2018 | 5/29/2018 | A | PASS |
Tony Young
|
|
|
Pls contact Greg (Project Mgr) @ ###-#### if you have any questions. Thank you. Inspection requested via web by Rob Maes// the electrical permit was on the 1010 Washington address,, ok,, see ele18-00880
|
DOC - Permit Finaled | 5/29/2018 | 5/29/2018 | 5/29/2018 | P | PASS |
Tony Young
|
|
|
done
|
BLD-Final | 5/25/2018 | 5/29/2018 | 5/29/2018 | A | NR |
Tony Young
|
|
|
Pls contact Greg (Project Mgr) @ ###-#### if you have any questions. Thank you. Inspection requested via web by Rob Maes,, still needs electrical permit and inspection,, recieved letter from structural engineer of ok on installation
|
BLD-Final | 5/10/2018 | 5/11/2018 | 5/11/2018 | A | NR |
Tony Young
|
|
|
Please contact Greg Meyet @ ###-#### one hour prior to arrival. He will meet you on site. Thank you. Inspection requested via web by Rob Maes,, called.. no answer,, left messege.. no return call,, will need electrical permit and inspection,, need letter of ok as built from the structural engineer..
|
BLD-Final | 5/3/2018 | 5/4/2018 | 5/4/2018 | A | NR |
Jim Sly
|
|
|
Pls contact Bryce (Foreman) @ ###-#### or George (Electrician) @ ###-#### one hr prior or if you have any questions. Thank you. Inspection requested via web by Rob Maes Verified Electr. finaled. Told Bryce That he needs Special inspection of epoxy bolting ....before final.
|
BLD-Framing/Rough-in | 3/16/2018 | 3/21/2018 | 3/21/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|