Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD17-04140
StatusFinaled
Name TIMBER AND LOVE INC
Site Address 5317 W WYLIE LN
Project Name 
Customer NumberDEMO BLD17-04043
ePlanReviewNo
Description
***Plan Modification 2-2-18 Altering concrete stair design. See new Engineering. *** BJM ***PLAN MODIFICATION - 12-15-17 - ALTERING STAIRS TO BE CANTILEVERED, CONCRETE STAIRS. SEE ENGINEERING. ***BJM*** FLOODPLAIN - Reference demolition permit of existing house Bld17-04043/Esc17-01528; Permit for the construction of a new 3026 sq. ft., two story (first story 1749 sq. ft., second story 1277 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 190 sq. ft. of covered patio/porch and a 502 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. **BJM***
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/12/20184/12/20184/12/2018PPASS
DetailsTony Young
Dusty Phone #: ###-####,, all corrections made ok at time of inspection
DOC - Permit Finaled4/12/20184/12/20184/12/2018PPASS
DetailsTony Young
certificate of occupancy issued
BLD-Final4/10/20184/11/20184/11/2018PFAIL
DetailsTony Young
Dusty Phone #: ###-####,, walk through only,, needs trades, pw flood plain,, stairs, hand rails , drainage etc. to meet min. code
BLD-Wall Bracing3/1/20183/2/20183/2/2018APASS
DetailsTony Young
Dusty Phone #: ###-####, interior ok
BLD-Energy code compliance2/28/20183/1/20183/1/2018ADONE
DetailsTony Young
Dusty Phone #: ###-####
BLD-Energy code compliance2/16/20182/16/20182/16/2018PPASS
DetailsTony Young
Dusty Phone #: ###-####,, work in progress,, ok,, will need interior shear later
BLD-Framing/Rough-in2/15/20182/16/20182/16/2018APART
DetailsTony Young
Dusty Phone #: ###-####,, see other notes,, flood cert ok per JT
BLD-Framing/Rough-in2/15/20182/16/20182/16/2018APART
DetailsTony Young
Dusty Phone #: ###-####,, need truss braces,, ok to insulate
BLD-Framing/Rough-in2/14/20182/15/20182/15/2018PNR
DetailsTony Young
Dusty Phone #: ###-####,, needs truss engineering,, seal package
BLD-Wall Bracing2/12/20182/13/20182/13/2018APASS
DetailsTony Young
Dusty Phone #: ###-####,, reviewed letter and fixes from performance engineering,, ok to cover exterior
BLD-Wall Bracing2/5/20182/5/20182/5/2018PPEND
DetailsTony Young
Dusty Phone #: ###-####,, need a letter of ok from the structural engineer on all structural elements as built,, covered up and changes made,, added bolt for hold down,, king stud difference
BLD-Conference1/30/20181/31/20181/31/2018ADONE
DetailsDave Hannah
Dusty Phone #: ###-####
BLD-Concrete1/4/20181/5/20181/5/2018APASS
DetailsDave Hannah
Zack Phone #: ###-####
BLD-Footing1/4/20181/4/20181/4/2018PNR
DetailsDave Hannah
Zack Phone #: ###-####
BLD-Other12/20/201712/20/201712/20/2017PPASS
DetailsMike Jordan
slab insulation insp // Zach ###-####
BLD-Footing12/8/201712/8/201712/8/2017PPASS
DetailsDave Hannah
Zach Phone #: ###-####