BLD-Final | 9/24/2019 | 9/25/2019 | 9/25/2019 | A | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####-still need PW sign off. OK fpr perm occ.
|
FIRE-Final Inspection | 9/23/2019 | 9/24/2019 | 9/24/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Jim Phone #: ###-####
|
FIRE-Final Inspection | 9/23/2019 | 9/23/2019 | 9/23/2019 | P | CANC |
Troy Cobbley
|
|
|
Need the FIR inspection for the range hoods scheduled/passed. Jim Phone #: ###-####
|
BLD-Conference | 9/20/2019 | 9/20/2019 | 9/20/2019 | P | DONE |
Mike Jordan
|
|
|
Michael pre final walk around, see you around 1 Phone #: ###-#### Inspection requested via web by Jim Carriveau
|
FIRE-Final Inspection | 9/18/2019 | 9/19/2019 | 9/19/2019 | A | FAIL |
Troy Cobbley
|
|
|
Previous correctlons have been addressed but additional permits are required for the residential type 1 hood extinguishing systems. Jim Phone #: ###-####
|
FIRE-Final Inspection | 9/11/2019 | 9/12/2019 | 9/12/2019 | P | FAIL |
Jim Page
|
|
|
FIR permits for hood suppression and fire alarm need to be finaled before life fire safety can be signed as complete. Provice internally illuminated exit signage and emergency lighting on exterior gates. Fire caulk condensate drain hole in riser room, riser room is a 1 hour rated assembly. Escutcheon in level 1 common restroom does not cover the entire sprinkler hole, escutcheon must cover entire hole. Remove masking from sprinkler heads in level 2 janitors closet and mech room.
Jim Phone #: ###-####
|
BLD-Conference | 9/10/2019 | 9/11/2019 | 9/11/2019 | A | CANC |
Tell Riley
|
|
|
Hello Michael, pre walk and consult preparing for final Phone #: ###-#### Inspection requested via web by Jim Carriveau//cancel per Jim-he will reschedule for tomorrow//
|
FIRE-Conference | 8/30/2019 | 8/30/2019 | 8/30/2019 | P | DONE |
Troy Cobbley
|
|
|
Jim and I discussed the smoke detectors for the daycare area of this project. See E3.1 drawing sheet for reference.
|
BLD-Ceiling Grid Inspection | 8/7/2019 | 8/7/2019 | 8/7/2019 | A | PASS |
Mike Jordan
|
|
|
Kitchen ceiling grid, Phone #: ###-#### Inspection requested via web by Jim Carriveau
|
BLD-Ceiling Grid Inspection | 7/25/2019 | 7/25/2019 | 7/25/2019 | A | CANC |
Tell Riley
|
|
|
Ceiling grid west single story-- BLD18-00632, i am using BLD 17-04447 to login as 00632 has a plan modification, not affecting ceiling grid though Phone #: ###-#### Inspection requested via web by Jim Carriveau
|
BLD-Ceiling Grid Inspection | 7/17/2019 | 7/18/2019 | 7/18/2019 | A | PASS |
Mike Jordan
|
|
|
Jim- 1st floor hall way and lobby Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/9/2019 | 7/9/2019 | 7/9/2019 | A | PASS |
Mike Jordan
|
|
|
2nd floor ceiling grid Phone #: ###-#### Inspection requested via web by Jim Carriveau
|
BLD-Ceiling Grid Inspection | 6/17/2019 | 6/17/2019 | 6/17/2019 | A | PASS |
Mike Jordan
|
|
|
Hello Michael ceiling grid inspection 1st floor, north and south sides Phone #: ###-#### Inspection requested via web by Jim Carriveau
|
BLD-Wall cover | 4/15/2019 | 4/15/2019 | 4/15/2019 | A | PASS |
Mike Jordan
|
|
|
Hello Mike draft stop inspection 2nd floor mechanical shaft Phone #: ###-#### Inspection requested via web by Jim Carriveau. Firestoping ok.
|
BLD-Framing/Rough-in | 4/12/2019 | 4/12/2019 | 4/12/2019 | A | PASS |
Mike Jordan
|
|
|
Hello Mike inspection for cover 2nd floor hard lids Phone #: ###-#### Inspection requested via web by Jim Carriveau. 2nd. floor hardlids ok. Needs to fire block mech. shaft at 2nd. floor.
|
BLD-Wall cover | 4/3/2019 | 4/3/2019 | 4/3/2019 | P | PASS |
Mike Jordan
|
|
|
Hello Mike i have the pipe penetrations and expansion joint complete with fire treatment in our 2 hour separation wall, inspection for cover. Phone #: ###-#### Inspection requested via web by Jim Carriveau. MAsonry 2hr. fire wall penetrations and CJ completed.
|
BLD-Energy code compliance | 3/29/2019 | 3/29/2019 | 3/29/2019 | A | PASS |
Dave Hannah
|
|
|
Hello Mike 2nd floor south side exterior insulation Phone #: ###-#### Inspection requested via web by Jim Carriveau
|
BLD-Energy code compliance | 3/21/2019 | 3/22/2019 | 3/22/2019 | A | PASS |
Mike Jordan
|
|
|
Hello Mike insulation exterior walls for cover, north wing 2nd floor Phone #: ###-#### Inspection requested via web by Jim Carriveau. 2nd floor, north wing exterior walls ok.
|
BLD-Framing/Rough-in | 3/19/2019 | 3/20/2019 | 3/20/2019 | A | PASS |
Mike Jordan
|
|
|
Hello Mike Hard Lids first floor for cover. i also have the information to clean up the correction notice on our foam spray insulation Phone #: ###-#### Inspection requested via web by Jim Carriveau. 1st. floor hardlids ok to cover. After reiview of corrected IAMPO report, noted that spray foam insulation used does not require an added ignition barrier.
|
BLD-Energy code compliance | 3/7/2019 | 3/8/2019 | 3/8/2019 | A | PASS |
Mike Jordan
|
|
|
first floor exterior wall insulation Phone #: ###-#### Inspection requested via web by Jim Carriveau. 1st. floor.
|
BLD-Framing/Rough-in | 3/8/2019 | 3/8/2019 | 3/8/2019 | P | FAIL |
Mike Jordan
|
|
|
first floor exterior wall insulation Phone #: ###-#### Inspection requested via web by Jim Carriveau. Spray faom insulation requires an ignition barrier.
|
BLD-Framing/Rough-in | 3/6/2019 | 3/6/2019 | 3/6/2019 | A | PASS |
Mike Jordan
|
|
|
framing on a sofitt for cover Phone #: ###-#### Inspection requested via web by Jim Carriveau. Will provide the ESR report for the foam insulation. Also inspected intrerior steel stud framed walls, 1st. floor ok.
|
BLD-Framing/Rough-in | 2/6/2019 | 2/7/2019 | 2/7/2019 | A | PASS |
Mike Jordan
|
|
|
Hello Mike, we want to look at 1 hour assembly of elevator machine room,, shaft wall Inspection requested via web by Jim Carriveau. Interior layer of 1 inch saft board for 1 hr. ceiling asembly in elevator machine room.
|
BLD-Framing/Rough-in | 1/14/2019 | 1/14/2019 | 1/14/2019 | P | PASS |
Mike Jordan
|
|
|
Hello Mike we would like to inspect for cover to begin exterior drywall on the 2 story structure. i am here till 3:00 . We can do tomorrow am if that works better for you? Phone #: ###-#### Inspection requested via web by Jim Carriveau. Exterior steel stud wall framing for the 1st and 2nd. floors at the south east and waest exterior walls.
|
BLD-Framing/Rough-in | 1/9/2019 | 1/9/2019 | 1/9/2019 | A | PART |
Brandon Shaw
|
|
|
Partial framing inspection in order to drywall parapet at roof ...
|
BLD-Concrete | 11/12/2018 | 11/13/2018 | 11/13/2018 | A | PASS |
Mike Jordan
|
|
|
Hello Michael requesting inspection for 2nd floor concrete on pan deck placement, mesh and rebar Phone #: ###-#### Inspection requested via web by Jim Carriveau
|
BLD-Concrete | 9/25/2018 | 9/25/2018 | 9/25/2018 | P | DEFR |
Mike Jordan
|
|
|
Hello Mike, we have a structural block grout placement at 2 pm today Phone #: ###-#### Inspection requested via web by Jim Carriveau
|
BLD-Concrete | 9/18/2018 | 9/18/2018 | 9/18/2018 | P | PART |
Mike Jordan
|
|
|
Hello Mike, we have a masonry grout placement at 2:00 this afternoon, Strata will be onsite for rebar and grout testing Phone #: ###-#### Inspection requested via web by Jim Carriveau. Work in progress. Special inspector on site.
|
BLD-Foundation | 8/20/2018 | 8/21/2018 | 8/21/2018 | P | PART |
Mike Jordan
|
|
|
we will be placing our final foundation concrete at 1:00 Tuesday. Strata will be onsite for rebar and concrete testing Phone #: ###-#### Inspection requested via web by Jim Carriveau. Placement in progress.
|
BLD-Foundation | 8/13/2018 | 8/14/2018 | 8/14/2018 | A | PASS |
Mike Jordan
|
|
|
we will be placing 18 yards in foundation stem wall 12:00. Strata will be onsite for rebar inspection and concrete testing Phone #: ###-#### Inspection requested via web by Jim Carriveau
|
BLD-Foundation | 8/9/2018 | 8/10/2018 | 8/10/2018 | A | DEFR |
Mike Jordan
|
|
|
we will be placing 77 yards in stem walls and footings. 11:00 placement. Strata will be onsite for rebar inspection at 10 with concrete testing at 11 Phone #: ###-#### Inspection requested via web by Jim Carriveau
|
BLD-Footing | 8/1/2018 | 8/2/2018 | 8/2/2018 | P | DEFR |
Mike Jordan
|
|
|
Hi Mike, hoping for a 1 30 rebar inspection, east and south exterior footing. Strata will be onsite at 1;30 and 10:00 Friday for concrete testing Phone #: ###-#### Inspection requested via web by Jim Carriveau. Pending special inspection.
|
BLD-Footing | 7/30/2018 | 7/31/2018 | 7/31/2018 | A | PASS |
Mike Jordan
|
|
|
Mike, requesting rebar inspection Tuesday 10 am, we will have rebar in gym floor, elevator, stair tower walls, and exterior footings, 235 yards to be placed Wednesday morning 3 am. Strata will be inspecting rebar and concrete testing Phone #: ###-#### Inspection requested via web by Jim Carriveau
|
BLD-Footing | 7/18/2018 | 7/19/2018 | 7/19/2018 | A | PASS |
Mike Jordan
|
|
|
Hello Mike, looking for rebar inspection at the large spread footing for the elevator, stair tower. Strata will be onsite at 10 to look at rebar. Concrete placement friday 4 am Phone #: ###-#### Inspection requested via web by Jim Carriveau
|
BLD-Conference | 6/14/2018 | 6/15/2018 | 6/15/2018 | A | DONE |
Mike Jordan
|
|
|
Hey Michael, hoping i can schedule a 10 am pre con on site with you and Strata for tomorrow Phone #: ###-#### Inspection requested via web by Jim Carriveau. Went over special inspection requirements. lso discussed the issue of project having 2 building permits. All MEP inspections will occur under this building permit and will reference area of work that has been inspected. All building inspections will occur under the required bldg. permit as well as life/safety finals.
|
BLD-Concrete | 9/18/2018 | 9/19/2018 | | A | |
Mike Jordan
|
|
|
Hey Mike, we are placing a slab on grade tomorrow at 4am, strata will b onsite for rebar and concrete testing. You could look at our slab prep today if you come out for the grout placement Phone #: ###-#### >> Inspection requested via web by Jim Carriveau
|