BLD-Aging Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 | | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 8/6/2019 | 8/6/2019 | 8/6/2019 | | DONE |
Jim Storey
|
|
|
|
BLD-Final | 6/6/2019 | 6/7/2019 | 6/7/2019 | A | PASS |
Jim Storey
|
|
|
Building Final Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Final | 5/30/2019 | 5/31/2019 | 5/31/2019 | P | NR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by J.C. Murray
|
FIRE-Final Inspection | 5/30/2019 | 5/31/2019 | 5/31/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire al;arm inspection complete, fire extinguishers are placed with current inspection tags, knox box is located by fire sprinkler riser room. Final life fire safety inspection complete, fire alarms must be monitored after occupancy.
Fire / Life ; Safety Phone #: ###-#### Inspection requested via web by J.C. Murray
|
FIRE-Final Inspection | 5/9/2019 | 5/10/2019 | 5/10/2019 | A | CANC |
Troy Cobbley
|
|
|
Not ready for life safety. Still need sprinkler final and paving has not been started yet for fire dept access. Bld C - FIRE / LIFE ; SAFETY re-inspection patched sprinkler holes Phone #: ###-#### Inspection requested via web by J.C. Murray
|
FIRE-Final Inspection | 5/8/2019 | 5/9/2019 | 5/9/2019 | A | CANC |
Troy Cobbley
|
|
|
Not ready for final. Need the project related fire sprinkler permit finaled and ceiling repaired prior to an inspection
Bld C - FIRE / LIFE ; SAFETY Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Ceiling Grid Inspection | 1/14/2019 | 1/15/2019 | 1/15/2019 | P | PASS |
Jim Storey
|
|
|
Bld C; south 12 units, drop ceilings for cover. fire caulking Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Wall cover | 12/28/2018 | 12/28/2018 | 12/28/2018 | P | PASS |
Jim Storey
|
|
|
Bld C - drop ceilings for cover, B-Units Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Ceiling Grid Inspection | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | PASS |
Jim Storey
|
|
|
Bld C - D-Units, north 6. ceiling grid for cover drop ceilings. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Other | 12/11/2018 | 12/12/2018 | 12/12/2018 | A | PASS |
Mike Jordan
|
|
|
rc channel // clint Phone #: ###-####. RC channel for floor ceilng assemblies and corridor.
|
BLD-Energy code compliance | 12/6/2018 | 12/7/2018 | 12/7/2018 | P | PASS |
Jim Storey
|
|
|
Bld C - south 12. B-Units and D-Units. all three floors. insulation for cover. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 12/4/2018 | 12/5/2018 | 12/5/2018 | P | PASS |
Jim Storey
|
|
|
Bld C - south units B and D. south 12 for fire caulking and framing. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 12/4/2018 | 12/4/2018 | 12/4/2018 | P | DEFR |
Jim Storey
|
|
|
Bld C - south units B and D. south 12 for fire caulking and framing. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 11/30/2018 | 11/30/2018 | 11/30/2018 | P | PASS |
Jim Storey
|
|
|
Bld C - north B-Units recheck on fire caulking in furnace cavities. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Energy code compliance | 11/30/2018 | 11/30/2018 | 11/30/2018 | P | PASS |
Jim Storey
|
|
|
Bld C - north B-Units 1st, 2nd, 3rd floors 6 Units Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 11/28/2018 | 11/29/2018 | 11/29/2018 | A | NR |
Jim Storey
|
|
|
revised Bld C inspection for North (6) B-Units framing and fire caulking. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 11/27/2018 | 11/28/2018 | 11/28/2018 | P | CANC |
Jim Storey
|
|
|
Bld C - interior framing/ fire caulking B-Units and south D-Units Phone #: ###-#### Inspection requested via web by J.C. Murray north b 6 units ok to insulate.
|
BLD-Framing/Rough-in | 11/14/2018 | 11/15/2018 | 11/15/2018 | A | PASS |
Jim Storey
|
|
|
Bld C- roof truss engineering Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 11/13/2018 | 11/14/2018 | 11/14/2018 | A | DEFR |
Jim Storey
|
|
|
Bld C- roof truss engineering and interior framing. Phone #: ###-#### Inspection requested via web by J.C. Murray no plans
|
BLD-Framing/Rough-in | 10/16/2018 | 10/16/2018 | 10/16/2018 | P | PASS |
Jim Storey
|
|
|
exterior shear nailing and strapping Building C Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 9/20/2018 | 9/21/2018 | 9/21/2018 | A | PART |
Brandon Shaw
|
|
|
Perimeter anchor bolts and hold downs.
|
BLD-Energy code compliance | 8/7/2018 | 8/8/2018 | 8/8/2018 | P | PASS |
Jim Storey
|
|
|
Building C - foundation insulation and vapor barrier Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Foundation | 7/13/2018 | 7/13/2018 | 7/13/2018 | P | PASS |
Jim Storey
|
|
|
WALL // Manny Phone #: ###-####
|
BLD-Footing | 7/10/2018 | 7/10/2018 | 7/10/2018 | P | PASS |
Jim Storey
|
|
|
JC Phone #: ###-####
|