BLD-Final | 10/17/2019 | 10/17/2019 | 10/17/2019 | P | DONE |
Jim Storey
|
|
|
Brian Phone #: ###-####
|
FIRE-Final Inspection | 8/26/2019 | 8/29/2019 | 8/29/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection complete, card signed for fire alarm, fire sprinkler and life safety.
call rob Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Final | 8/26/2019 | 8/29/2019 | 8/28/2019 | P | DONE |
Jim Storey
|
|
|
call rob Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Final | 8/27/2019 | 8/28/2019 | 8/28/2019 | P | PASS |
Jim Storey
|
|
|
rob final ok pending fire
|
BLD-Framing/Rough-in | 5/15/2019 | 5/16/2019 | 5/16/2019 | A | PASS |
Jim Storey
|
|
|
Bld E - west side drop ceilings for cover, fire caulking Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Energy code compliance | 4/11/2019 | 4/12/2019 | 4/12/2019 | A | PASS |
Jim Storey
|
|
|
insulation inspection. Phone #: ###-#### Inspection requested via web by J.C. Murray ok for cover
|
BLD-Other | 3/13/2019 | 3/14/2019 | 3/14/2019 | A | PASS |
Jim Storey
|
|
|
fire caulking- Craig Phone #: ###-####
|
BLD-Framing/Rough-in | 1/10/2019 | 1/11/2019 | 1/11/2019 | A | PASS |
Mike Jordan
|
|
|
Bld H - framing roof trusses/ engineering. hold downs, titan bolts. exterior shear nailing. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 10/24/2018 | 10/25/2018 | 10/25/2018 | A | PASS |
Jim Storey
|
|
|
Building H interior shear walls. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Foundation | 8/3/2018 | 8/3/2018 | 8/3/2018 | P | PASS |
Jim Storey
|
|
|
Manual Phone #: ###-####
|
BLD-Foundation | 8/1/2018 | 8/1/2018 | 8/1/2018 | P | CANC |
Jim Storey
|
|
|
Manual Phone #: ###-####
|
BLD-Footing | 8/1/2018 | 8/1/2018 | 8/1/2018 | P | PASS |
Jim Storey
|
|
|
Manual Phone #: ###-####
|