Permit Information
Permit NumberBLD17-04634
StatusFinaled
Name K2 CONSTRUCTION
Site Address 800 W DIAMOND ST
Project NameAce Co. Break Room Addition
Customer Number 
ePlanReviewYes
Description
(ACECO MANUFACTURING - BREAK ROOM) (DRH17-00543) This building is fire sprinklered for fire area. Permit for a 717 sq ft addition with new break room and restrooms. Work to include: new exterior walls, roof, and concrete slab; new mechanical, electrical, and plumbing; related site work; interior finishes in compliance with Ch. 8 of the 2012 IBC. Special inspections are required per Form 310. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/30/20185/31/20185/31/2018APASS
DetailsJim Storey
Dennis Phone #: ###-####
BLD-Final5/29/20185/30/20185/30/2018PDEFR
DetailsJim Storey
Dennis Phone #: ###-####
FIRE-Final Inspection5/30/20185/30/20185/30/2018APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection for area of work complete.
BLD-Other5/29/20185/30/20185/30/2018PCANC
DetailsJim Storey
Dennis Phone #: ###-####
BLD-Final5/25/20185/29/20185/29/2018PNR
DetailsJim Sly
Derek Phone #: ###-####
Need Zoning, Fire/life, Fire alarm, and plumbing finals. Cannot find Plumbing permit. Permit Techs cannot find Plumbing permit either. Notified Contractor.
FIRE-Final Inspection5/25/20185/29/20185/29/2018AFAIL
DetailsJim Page
Fire alarm panel was in alarm at time of inspection and fire panel would not reset, life fire safety inspection will need to be rescheduled after fire alarm issue is resolved.



Derek Phone #: ###-####
BLD-Final5/25/20185/29/20185/29/2018ACANC
DetailsJim Sly
Dennis- for landscape and zoning Phone #: ###-####
BLD-Energy code compliance5/1/20185/2/20185/2/2018PPASS
DetailsJim Storey
Steve---Dennis Peterson is the contact Phone #: ###-####
BLD-Framing/Rough-in4/25/20184/26/20184/26/2018PPASS
DetailsJim Storey
Steve Phone #: ###-#### insulation and slip sheet ok
BLD-Framing/Rough-in4/24/20184/25/20184/25/2018PPASS
DetailsJim Storey
Shawn Phone #: ###-#### roof nailling ok
BLD-Wall Bracing4/24/20184/25/20184/25/2018PPASS
DetailsJim Storey
Shawn Phone #: ###-#### wall nailling and hold downs ok
BLD-Foundation3/29/20183/30/20183/30/2018PPASS
DetailsJim Storey
rebar stem wall-Steve Phone #: ###-####
BLD-Footing3/28/20183/29/20183/29/2018PPASS
DetailsJim Storey
Rebar, pouring at 2:30 - Jay Phone #: ###-####