BLD-Final | 3/29/2018 | 3/30/2018 | 4/2/2018 | P | PASS |
Dave Hannah
|
|
|
Mike-please call 30 minutes prior to meet for access Phone #: ###-####
|
FIRE-Final Inspection | 3/29/2018 | 3/30/2018 | 3/30/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
Mike-please call 30 minutes prior to meet for access Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 3/27/2018 | 3/28/2018 | 3/28/2018 | A | DONE |
Mike Jordan
|
|
|
Call half hour before // Mike Phone #: ###-####. Grid is existing.
|
BLD-Framing/Rough-in | 2/28/2018 | 2/28/2018 | 2/28/2018 | P | PASS |
Mike Jordan
|
|
|
Call half hour before // Garett Phone #: ###-####
|
BLD-Framing/Rough-in | 2/20/2018 | 2/21/2018 | 2/21/2018 | A | PART |
Mike Jordan
|
|
|
Please call 30 min. before inspection Phone #: ###-#### Inspection requested via web by Garrett Bailey. INterior steel stud framed walls ok for cover. Interior wood framed wall for restroom/shower has excceded code min. for notches. Architect to provide repair or remove plumbing and rebuild wall to meet code min.
|