BLD-Final | 6/27/2018 | 6/27/2018 | 6/28/2018 | P | DONE |
Tony Young
|
|
|
Andy Phone #: ###-####
|
BLD-Final | 6/26/2018 | 6/27/2018 | 6/27/2018 | A | PASS |
Tony Young
|
|
|
Andy Phone #: ###-####
|
DOC - Permit Finaled | 6/27/2018 | 6/27/2018 | 6/27/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 6/25/2018 | 6/26/2018 | 6/26/2018 | A | PEND |
Tony Young
|
|
|
Andy Phone #: ###-####
|
BLD-Final | 6/25/2018 | 6/25/2018 | 6/25/2018 | P | PART |
Tony Young
|
|
|
Andy Phone #: ###-####,, need trades,, needs fire caulking,, underfloor vapor barrier
|
BLD-Wall Bracing | 4/17/2018 | 4/17/2018 | 4/18/2018 | P | PASS |
Tony Young
|
|
|
interior shear, Andy; Phone #: ###-####
|
BLD-Wall Bracing | 4/16/2018 | 4/16/2018 | 4/16/2018 | P | NR |
Jim Storey
|
|
|
Andy Phone #: ###-####
|
BLD-Energy code compliance | 4/5/2018 | 4/6/2018 | 4/6/2018 | A | PASS |
Tony Young
|
|
|
Andy Phone #: ###-####
|
BLD-Framing/Rough-in | 4/2/2018 | 4/2/2018 | 4/2/2018 | P | PART |
Tony Young
|
|
|
please call when on way // andy douglas Phone #: ###-####,, ok to insulate,, see paint notes
|
BLD-Wall Bracing | 2/28/2018 | 3/1/2018 | 3/1/2018 | A | PASS |
Tony Young
|
|
|
Shear // Larry Phone #: ###-####
|
BLD-Foundation | 2/1/2018 | 2/2/2018 | 2/2/2018 | A | PASS |
Jim Sly
|
|
|
Matt Phone #: ###-####
|
BLD-Footing | 1/30/2018 | 1/31/2018 | 1/31/2018 | A | PASS |
Tony Young
|
|
|
Matt Phone #: ###-####
|
BLD-Footing | 1/29/2018 | 1/30/2018 | 1/31/2018 | P | NR |
Tony Young
|
|
|
Matt Phone #: ###-####
|
BLD-Conference | 1/25/2018 | 1/25/2018 | 1/25/2018 | P | PART |
Tony Young
|
|
|
want to check if staked correctly before start excavation // Ryan Phone #: ###-#### or call Andy ###-####,, looks ok but did not have reviewed plans
|