Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD17-04681
StatusFinaled
Name DAUBY CONSTRUCTION MGMT
Site Address 702 W IDAHO ST Unit: STE 400
Project NameThe Car Park Suite #400
Customer Number 
ePlanReviewYes
Description
(THE CAR PARK – KEY BANK BUILDING – 4th FLOOR SUITE #400) This building is fire sprinklered because it is a high-rise. Permit is to remodel an existing 7,096 sq. ft. office tenant space located on the 4th floor of an existing high-rise building. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, construction of interior non-bearing walls to create (4) offices, open office areas, (2) conference rooms, a monitoring room, a server room, a reception/waiting area, an electrical equipment room, an interview room, a quiet room, a money room, a break area, a collaboration area, a hall and an accessible restroom, new door/door frames, select new interior windows, millwork, select new gypsum ceiling, relocate existing light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/30/20183/30/20183/30/2018PPASS
DetailsDave Hannah
Eric Phone #: ###-####
BLD-Final3/21/20183/22/20183/23/2018PPART
DetailsDave Hannah
Eric-partial for temp c of o Phone #: ###-#### ok for temp occ ok for perm occ after elec gos perm
BLD-Final3/21/20183/22/20183/22/2018ACANC
DetailsDave Hannah
Eric-partial to get temp c of o Phone #: ###-####
FIRE-Final Inspection3/21/20183/21/20183/21/2018PPASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection for area of work complete.
BLD-Ceiling Grid Inspection3/1/20183/1/20183/2/2018PPASS
DetailsDave Hannah
Eric Phone #: ###-####
FIRE-Conference3/1/20183/1/20183/1/2018PDONE
DetailsJim Page
Fire conference complete
BLD-Framing/Rough-in2/7/20182/8/20182/8/2018PPASS
DetailsDave Hannah
Eric Phone #: ###-####