BLD-Final | 6/25/2018 | 6/26/2018 | 6/26/2018 | A | PASS |
Jim Storey
|
|
|
HVAC final pending airbalance in AM, all other finals complete Phone #: ###-#### Inspection requested via web by Ryan Wilhelm final ok pending mech
|
BLD-Final | 6/25/2018 | 6/26/2018 | 6/25/2018 | A | CANC |
Jim Storey
|
|
|
Request first/early inspect before 10am if possible. HVAC final to happen first thing AM, all others passed. Phone #: ###-#### >> Inspection requested via web by Ryan Wilhelm Inspection cancelled from web by: Ryan Wilhelm
|
BLD-Final | 6/24/2018 | 6/25/2018 | 6/25/2018 | P | CANC |
Jim Storey
|
|
|
Finishing Fire/HVAC in AM, Elec/Plumbing finaled. Phone #: ###-#### >> Inspection requested via web by Ryan Wilhelm Inspection cancelled from web by: Ryan Wilhelm
|
FIRE-Final Inspection | 6/24/2018 | 6/25/2018 | 6/25/2018 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguisher is in place with a current inspection tag, thumbturn deadbolts on south exit doors to be replaced with blanks before final BLD inspection, addressing will be installed when cracked front window is replaced. Final life fire safety inspection complete.
To coincide with alarm and sprinkler finals, as per their permit inspections. Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
|
BLD-Ceiling Grid Inspection | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | PASS |
Jim Storey
|
|
|
Ceiling cover for grid; trades should be done in AM Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
|
BLD-Framing/Rough-in | 4/30/2018 | 5/1/2018 | 5/1/2018 | A | PASS |
Jim Storey
|
|
|
Framing inspections. All trade rough-ins passed for cover. Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
|