BLD-Final | 9/13/2019 | 9/16/2019 | 9/16/2019 | A | PASS |
Tell Riley
|
|
|
Andy Phone #: ###-####//issues with corridors are taken care of//no changes needed//final complete//
|
BLD-Final | 8/29/2019 | 8/30/2019 | 8/30/2019 | P | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson. OK for temp occ. Needs to discuss corridor rating with plan review.
|
FIRE-Final Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Phone #: ###-#### Inspection requested via web by Andy Thompson
|
FIRE-Conference | 8/23/2019 | 8/23/2019 | 8/23/2019 | P | DONE |
Troy Cobbley
|
|
|
Inspection was a conference/sprinkler rough-in for the "boxes/insulation" on the cpvc sprinkler pipng in the patio storage closets. Contractor has installed "boxed" the piping with insulation. Piping is ok for cover.
Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD-Foundation | 11/6/2018 | 11/6/2018 | 11/6/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD-Footing | 11/4/2018 | 11/5/2018 | 11/5/2018 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson
|