BLD-Aging Inspection | 7/8/2020 | 7/8/2020 | 7/9/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 7/7/2020 | 7/7/2020 | 7/9/2020 | | PASS |
Tony Young
|
|
|
|
BLD-Final | 2/24/2020 | 2/24/2020 | 2/24/2020 | P | PASS |
Tony Young
|
|
|
MANNY Phone #: ###-####
|
FIRE-Final Inspection | 2/24/2020 | 2/24/2020 | 2/24/2020 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final life fire safety inspection is complete, signature card not available at time of inspection. Kitchen hood is to not be used for any reason, a permit will be required for modifications to the hood fire suppression system to accomidate new appliances, no appliances are under the type 1 hood as of this inspection.
|
FIRE-Conference | 2/21/2020 | 2/24/2020 | 2/24/2020 | A | CANC |
Jim Page
|
|
|
Request was for a final inspection, not a conference, this request is cancelled.
Call ahead // Manny Phone #: ###-####
|
FIRE-Final Inspection | 1/22/2020 | 1/23/2020 | 1/23/2020 | A | FAIL |
Jim Page
|
|
|
Provided a double-keyed deadbolt for main entry, door currently has thumbturn deadbolt. Provide signage on main entry door that reads "Door to remain unlocked while building is occupied". Provide exit emergency lighting for exit discharge to public way as discussed. Level 1 has a type 1 hood with a suppression system, no appliances are under hood, when appliances are added a seperate permit will be required for suppression system modifications, hood CANNOT be used until permitted, inspected and passed.
call prior - manny Phone #: ###-####
|
BLD-Conference | 12/23/2019 | 12/24/2019 | 12/24/2019 | A | PART |
Tony Young
|
|
|
Many Phone #: ###-####.. general ?s on the final
|
BLD-Final | 12/20/2019 | 12/20/2019 | 12/20/2019 | P | CANC |
Tell Riley
|
|
|
Manny Phone #: ###-####//need fire life safety//will reschedule//
|
BLD-Aging Inspection | 11/15/2019 | 11/15/2019 | 11/20/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 11/14/2019 | 11/14/2019 | 11/20/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Other | 10/25/2019 | 10/25/2019 | 10/25/2019 | P | PASS |
Tell Riley
|
|
|
Manny- drop celing inspection Phone #: ###-####//1st floor grid ok to cover//
|
BLD-Conference | 10/9/2019 | 10/9/2019 | 10/9/2019 | P | PEND |
Tony Young
|
|
|
Manny Phone #: ###-####,, rest room ?s,, need to make per the plan
|
BLD-Other | 9/19/2019 | 9/19/2019 | 9/20/2019 | P | DONE |
Tony Young
|
|
|
Many- inspection for T-bar celiing upstairs Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 9/19/2019 | 9/20/2019 | 9/20/2019 | A | PASS |
Tony Young
|
|
|
Many- inspection for T-bar celiing upstairs Phone #: ###-####
|
BLD-Energy code compliance | 7/2/2019 | 7/3/2019 | 7/3/2019 | A | PASS |
Tony Young
|
|
|
Manny Phone #: ###-####
|
BLD-Framing/Rough-in | 6/14/2019 | 6/14/2019 | 6/14/2019 | P | PASS |
Tony Young
|
|
|
Manny Phone #: ###-####,, ok to insulate
|
BLD-Conference | 5/16/2019 | 5/16/2019 | 5/16/2019 | P | PART |
Tony Young
|
|
|
Call ahead // Manny Phone #: ###-####.. insulation ?s,, existing can stay just made it as good as possible
|