BLD-Final | 6/13/2018 | 6/13/2018 | 6/13/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 6/13/2018 | 6/13/2018 | 6/13/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 6/12/2018 | 6/12/2018 | 6/12/2018 | P | NR |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Final | 6/11/2018 | 6/12/2018 | 6/12/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kyle Seick Inspection cancelled from web by: Kyle Seick
|
BLD-Final | 5/17/2018 | 5/18/2018 | 5/18/2018 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Weston Wagner
|
BLD-Energy code compliance | 4/18/2018 | 4/18/2018 | 4/18/2018 | A | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 4/16/2018 | 4/16/2018 | 4/16/2018 | P | FAIL |
Brandon Shaw
|
|
|
1) Studs needed to bear point load at garage 2) Shear panel edges to be blocked, as per plans 3)Provide Engineering approval for cut truss 4) Provide a copy of truss engineering
OK to insulate
|
BLD-Wall Bracing | 3/28/2018 | 3/29/2018 | 3/29/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Footing | 2/14/2018 | 2/14/2018 | 2/14/2018 | P | PASS |
Dave Hannah
|
|
|
Dion-please do as late as possible Phone #: ###-####
|
BLD-Footing | 2/14/2018 | 2/14/2018 | 2/14/2018 | A | CANC |
Dave Hannah
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion-
|