DOC - Permit Finaled | 1/9/2019 | 1/9/2019 | 1/9/2019 | A | PASS |
Jim Storey
|
|
|
|
BLD-Ceiling Grid Inspection | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | CANC |
Jim Storey
|
|
|
1st floor Area A Phone #: ###-#### Inspection requested via web by Robert Snow
|
BLD-Final | 12/10/2018 | 12/14/2018 | 12/14/2018 | A | CANC |
Mike Jordan
|
|
|
Dave Phone #: ###-####. Moved to pm.
|
BLD-Final | 12/12/2018 | 12/13/2018 | 12/13/2018 | A | NR |
Mike Jordan
|
|
|
Dave Phone #: ###-####. Needs fire/life/safety TCO first. Needs exiting completed.
|
BLD-Framing/Rough-in | 8/17/2018 | 8/17/2018 | 8/17/2018 | P | PASS |
Jim Storey
|
|
|
c/n 6/22 all idems made ok
|
BLD-Framing/Rough-in | 7/25/2018 | 7/26/2018 | 7/26/2018 | A | NR |
Jim Storey
|
|
|
exterior walls and interrior // Dave Phone #: ###-####
|
BLD-Other | 6/6/2018 | 6/7/2018 | 6/7/2018 | P | PASS |
Jim Storey
|
|
|
slab on grad // dave Phone #: ###-#### barrior in place rebar ok//
|
BLD-Framing/Rough-in | 5/31/2018 | 6/1/2018 | 6/1/2018 | A | PART |
Jim Storey
|
|
|
Dave Phone #: ###-#### work in progress/ need iecc at foundation r 10 and exterior insulation was propose due to lack of submitals on permit set.
|
BLD-Footing | 5/22/2018 | 5/24/2018 | 5/24/2018 | P | PASS |
Jim Storey
|
|
|
Rebar/slab - Dave Phone #: ###-#### placed with si
|
BLD-Foundation | 5/9/2018 | 5/10/2018 | 5/10/2018 | P | PASS |
Jim Storey
|
|
|
Kevin Phone #: ###-####sog ok
|
BLD-Concrete | 5/7/2018 | 5/8/2018 | 5/8/2018 | P | FAIL |
Jim Storey
|
|
|
Dave Phone #: ###-#### k bracing lower bolt/nut needs tourqe test before concrete placment 4 locations// doug fir backing must be fire treated for this type of const.
|
BLD-Foundation | 5/7/2018 | 5/7/2018 | 5/7/2018 | P | PASS |
Jim Storey
|
|
|
Dave-concrete reinforcement 2nd floor area C Phone #: ###-#### level 3 pass
|
BLD-Concrete | 5/2/2018 | 5/3/2018 | 5/3/2018 | P | PASS |
Jim Storey
|
|
|
Dave Phone #: ###-####sog vappor barrior ok
|
BLD-Concrete | 5/2/2018 | 5/2/2018 | 5/2/2018 | P | PASS |
Jim Storey
|
|
|
Dave Phone #: ###-#### slab on grade area 1 vappor barrior in place rebar spacing ok
|
BLD-Other | 4/18/2018 | 4/19/2018 | 4/19/2018 | P | PASS |
Jim Storey
|
|
|
Area B level 2 slab on deck reinforcement // Kevin Honeycutt Phone #: ###-#### si to pick up missing deck welds se opening/east side.
|
BLD-Foundation | 4/17/2018 | 4/18/2018 | 4/18/2018 | P | PASS |
Jim Storey
|
|
|
rebar for 3rd floor // Dave Phone #: ###-####
|
BLD-Concrete | 4/11/2018 | 4/11/2018 | 4/11/2018 | P | PART |
Jim Storey
|
|
|
Area A level 2 SOMD reinforcing. Special inspector onsite. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt si pick up west stair weld stuns missing/ clean up deck.
|
BLD-Concrete | 4/9/2018 | 4/10/2018 | 4/10/2018 | A | PASS |
Jim Storey
|
|
|
Level 3 SOMD reinforcement. Special Inspector to be onsite. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt west end
|
BLD-Footing | 3/21/2018 | 3/22/2018 | 3/22/2018 | A | PASS |
Jim Storey
|
|
|
Elevator pits footings. Concrete at 10AM Geotek onsite Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
|
BLD-Foundation | 2/28/2018 | 3/1/2018 | 3/1/2018 | A | PASS |
Jim Storey
|
|
|
GL-A,5 stem walls. GL-2 continuous footings. Concrete at 1PM, special inspector onsite. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
|
BLD-Footing | 2/27/2018 | 2/28/2018 | 2/28/2018 | P | CANC |
Jim Storey
|
|
|
Continuous footing GL-2. Stem walls GL-A,5. Concrete at 2PM special inspector onsite Phone #: ###-#### >> Inspection requested via web by Kevin Honeycutt
|
BLD-Footing | 2/26/2018 | 2/27/2018 | 2/27/2018 | A | PASS |
Jim Storey
|
|
|
Continuous footing GL-5,A,2. Special inspector onsite, Concrete is at 2PM ready for City inspection at 1PM. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
|
BLD-Footing | 2/26/2018 | 2/27/2018 | 2/26/2018 | P | CANC |
Jim Storey
|
|
|
Continuous footing GL - A,5,2 Phone #: ###-#### >> Inspection requested via web by Kevin Honeycutt Inspection cancelled from web by: Kevin Honeycutt
|
BLD-Footing | 2/21/2018 | 2/21/2018 | 2/22/2018 | P | PEND |
Dave Hannah
|
|
|
Spread footings GL- B;C/ GL-3;4. Special Inspector onsite Phone #: ###-#### Inspection requested via web by Kevin Honeycutt ok after spec sign offs
|
BLD-Footing | 2/20/2018 | 2/20/2018 | 2/20/2018 | P | PART |
Jim Sly
|
|
|
Ready at 3:30 PM. Concrete tomorrow at 4:30 AM. Special inspector will be onsite. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt Matt footings and piers at Gridline A, 5 and 2. OK pending Geotek special inspection, tests and approvals.
|
BLD-Foundation | 2/14/2018 | 2/15/2018 | 2/15/2018 | P | PASS |
Jim Storey
|
|
|
Mat footing on GL-2 between J;K. Stem walls on GL-2 between D;H. Stem walls on GL-5 between F;L. Stem walls on GL-4 between L;N. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
|
BLD-Footing | 2/12/2018 | 2/13/2018 | 2/13/2018 | A | PASS |
Jim Storey
|
|
|
Continuous footing on GL-2 ; 5. Concrete is at 12PM, special inspector will be onsite. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
|
BLD-Footing | 2/6/2018 | 2/7/2018 | 2/7/2018 | A | PART |
Jim Storey
|
|
|
Call if you have trouble finding us. Concrete is scheduled for 12PM, Special inspection is complete. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt no aproved plan on site si on site/ genral confomance ok / engineers aproval on site review ok to place concrete
|