BLD-Final | 11/27/2018 | 11/27/2018 | 11/27/2018 | P | PASS |
Tony Young
|
|
|
Ready for final Phone #: ###-#### Inspection requested via web by Clayton Conner
|
DOC - Permit Finaled | 11/27/2018 | 11/27/2018 | 11/27/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 11/26/2018 | 11/27/2018 | 11/27/2018 | A | PASS |
Tony Young
|
|
|
clayton Phone #: ###-####
|
BLD-Blower Door Test Results | 11/26/2018 | 11/27/2018 | 11/27/2018 | A | PASS |
Tony Young
|
|
|
clayton Phone #: ###-####// 3.2
|
BLD-Final | 11/26/2018 | 11/26/2018 | 11/26/2018 | P | FAIL |
Tony Young
|
|
|
clayton Phone #: ###-####,, needs.. address, hillside from public works,, tempered glass in master bath,, mechanical permits passed,, fire caulking
|
BLD-Other | 7/5/2018 | 7/6/2018 | 7/6/2018 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Energy code compliance | 6/21/2018 | 6/21/2018 | 6/21/2018 | P | PART |
Tony Young
|
|
|
Caulk and seal inspection. Phone #: ###-#### Inspection requested via web by Clayton Conner,, need to seal low voltage wires and other open holes in plates
|
BLD-Framing/Rough-in | 6/21/2018 | 6/21/2018 | 6/21/2018 | P | PART |
Tony Young
|
|
|
Caulk and seal inspection. Phone #: ###-#### Inspection requested via web by Clayton Conner,, c/n in paint,, ok to insulate
|
BLD-Other | 5/23/2018 | 5/24/2018 | 5/24/2018 | A | PASS |
Dave Hannah
|
|
|
Clayton Conner - Soffit inspection. Sheetrock is up on the overhangs. Phone #: ###-#### Inspection requested via web by Clayton Conner
|
BLD-Wall Bracing | 5/22/2018 | 5/23/2018 | 5/23/2018 | A | PASS |
Dave Hannah
|
|
|
Blaten Phone #: ###-####
|
BLD-Foundation | 3/12/2018 | 3/12/2018 | 3/12/2018 | P | PART |
Tony Young
|
|
|
Cal Phone #: ###-####,, work in progress,, ok
|
BLD-Footing | 3/8/2018 | 3/8/2018 | 3/8/2018 | P | PASS |
Tony Young
|
|
|
Cal Phone #: ###-####
|