BLD-Final | 8/10/2018 | 8/10/2018 | 8/10/2018 | P | PASS |
Mike Jordan
|
|
|
Ok for perm occ. All issues have been resolved.
|
BLD-Final | 8/8/2018 | 8/9/2018 | 8/9/2018 | P | FAIL |
Mike Jordan
|
|
|
Please call ahead for lock code // chris Phone #: ###-####. Door hardware is still non code compliant.
|
FIRE-Final Inspection | 8/8/2018 | 8/9/2018 | 8/9/2018 | A | PASS |
Jim Page
|
|
|
Previously noted items have been completed, final life fire safety inspection complete.
Please call ahead for lock code // chris Phone #: ###-####
|
FIRE-Final Inspection | 7/10/2018 | 7/11/2018 | 7/12/2018 | A | FAIL |
Troy Cobbley
|
|
|
Provide single action hardware that is interconnected with the deadbolts or remove the deadbolts. Provide fire extinguishers as discusssed.
Chris Phone #: ###-####
|
BLD-Foundation | 4/3/2018 | 4/4/2018 | 4/4/2018 | A | PART |
Mike Jordan
|
|
|
Chris Phone #: ###-####. Work in progress. Noted that verts not at 4ft. oc or horizontals rebar does not have the min 18 inch lap length as noted on the city approved plans. Will have special inspection. noted to contractor that no concrete is to be placed until special inspector has verified all non compliance issues have been resolved.
|
BLD-Foundation | 4/2/2018 | 4/3/2018 | 4/3/2018 | P | NR |
Mike Jordan
|
|
|
Chris Phone #: ###-####. Rescheduled for tomorrow.
|