BLD-Final | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | PASS |
Jim Storey
|
|
|
Brett Phone #: ###-####
|
DOC - Permit Finaled | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | DONE |
Jim Storey
|
|
|
Brett Phone #: ###-#### 238
|
BLD-Energy code compliance | 6/18/2018 | 6/19/2018 | 6/19/2018 | P | PASS |
Jim Storey
|
|
|
Brett Phone #: ###-####
|
BLD-Framing/Rough-in | 6/18/2018 | 6/19/2018 | 6/19/2018 | A | PASS |
Jim Storey
|
|
|
Brett Phone #: ###-####
|
BLD-Framing/Rough-in | 6/14/2018 | 6/15/2018 | 6/15/2018 | A | FAIL |
Brandon Shaw
|
|
|
As per plans/engineering- Back garage shear wall, provide blocking full wall height Provide 20' CS14 strap at top cord of truss, with A35 clips and blocking See plans for details
OK to insulate
|
BLD-Wall Bracing | 5/16/2018 | 5/21/2018 | 5/21/2018 | A | PASS |
Jim Storey
|
|
|
shear- Bret Phone #: ###-####
|
BLD-Foundation | 4/12/2018 | 4/13/2018 | 4/13/2018 | P | PASS |
Jim Storey
|
|
|
Wall // Sabation Phone #: ###-####
|
BLD-Footing | 4/10/2018 | 4/11/2018 | 4/11/2018 | A | PASS |
Brandon Shaw
|
|
|
Sebastian Phone #: ###-####
|