BLD-Final | 10/25/2018 | 10/25/2018 | 10/25/2018 | P | PASS |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 10/25/2018 | 10/25/2018 | 10/25/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 10/25/2018 | 10/25/2018 | 10/25/2018 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.76
|
BLD-Final | 10/23/2018 | 10/23/2018 | 10/23/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 10/23/2018 | 10/23/2018 | 10/23/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 8/15/2018 | 8/16/2018 | 8/16/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Framing/Rough-in | 8/15/2018 | 8/15/2018 | 8/15/2018 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
OK to insulate
|
BLD-Framing/Rough-in | 8/13/2018 | 8/13/2018 | 8/13/2018 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
OK to insulate
|
BLD-Framing/Rough-in | 8/7/2018 | 8/8/2018 | 8/8/2018 | A | PART |
Brandon Shaw
|
|
|
Hold downs and straps to be installed as per plans, see pages S1.1 & S2.0 Nail bean brackets/bucket connectors per manufactures instalation instuct...
|
BLD-Other | 8/1/2018 | 8/2/2018 | 8/2/2018 | A | PASS |
Brandon Shaw
|
|
|
Soffitt Inspection requested via web by Kyle Seick
|
BLD-Wall Bracing | 6/22/2018 | 6/25/2018 | 6/25/2018 | P | PART |
Brandon Shaw
|
|
|
Hold downs to be as per plans
Work in progess
|
BLD-Foundation | 4/13/2018 | 4/13/2018 | 4/13/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Foundation | 4/12/2018 | 4/12/2018 | 4/13/2018 | P | CANC |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion
|
BLD-Footing | 4/11/2018 | 4/11/2018 | 4/11/2018 | P | PASS |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion
|
BLD-Footing | 4/9/2018 | 4/9/2018 | 4/9/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|