BLD-Final | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | PASS |
Brandon Shaw
|
|
|
Kyle Phone #: ###-####
|
DOC - Permit Finaled | 10/26/2018 | 10/26/2018 | 10/26/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4.27
|
BLD-Final | 9/20/2018 | 9/21/2018 | 9/21/2018 | P | CANC |
Brandon Shaw
|
|
|
PER BRANDON NEED TO SUBMIT ENGINEERING FOR CHANGES Phone #: ###-#### >> Inspection requested via web by Kyle Seick
|
BLD-Energy code compliance | 7/2/2018 | 7/3/2018 | 7/3/2018 | A | PEND |
Brandon Shaw
|
|
|
Pending Engineering fix for cut floor truss and gusset/stiffeners being installed
|
BLD-Framing/Rough-in | 6/22/2018 | 6/25/2018 | 6/25/2018 | A | FAIL |
Brandon Shaw
|
|
|
Need revised plans and Engineering See correction notice
Ok to insulate
|
BLD-Other | 6/21/2018 | 6/21/2018 | 6/21/2018 | P | PASS |
Brandon Shaw
|
|
|
Soffit/Sheetrock Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Framing/Rough-in | 6/11/2018 | 6/12/2018 | 6/12/2018 | P | NR |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Wall Bracing | 5/22/2018 | 5/22/2018 | 5/22/2018 | A | NR |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Foundation | 4/4/2018 | 4/4/2018 | 4/4/2018 | P | PASS |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion
|
BLD-Footing | 4/3/2018 | 4/3/2018 | 4/3/2018 | P | PASS |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion
|
BLD-Footing | 4/2/2018 | 4/2/2018 | 4/2/2018 | A | FAIL |
Brandon Shaw
|
|
|
NR
|