BLD-Final | 11/9/2018 | 11/9/2018 | 11/9/2018 | P | PASS |
Brandon Shaw
|
|
|
Kyle-as per Kyle plumbing signed off on a final tag that''s in the garage so i also assigned a plumbing plumbing Phone #: ###-####
|
DOC - Permit Finaled | 11/9/2018 | 11/9/2018 | 11/9/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 11/9/2018 | 11/9/2018 | 11/9/2018 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.25
|
BLD-Other | 9/13/2018 | 9/13/2018 | 9/13/2018 | A | PASS |
Brandon Shaw
|
|
|
Soffit
|
BLD-Energy code compliance | 9/12/2018 | 9/13/2018 | 9/13/2018 | A | PASS |
Brandon Shaw
|
|
|
Kyle-Kyle said plan mod that''s in for review has nothing to do with the inspections. so approved pans are not on the job site for some of the project Phone #: ###-####
|
BLD-Framing/Rough-in | 9/4/2018 | 9/4/2018 | 9/5/2018 | P | PASS |
Brandon Shaw
|
|
|
OK to insulate
|
BLD-Framing/Rough-in | 8/31/2018 | 8/31/2018 | 8/31/2018 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT... OK to insulate
|
BLD-Wall Bracing | 7/3/2018 | 7/3/2018 | 7/3/2018 | P | PART |
Brandon Shaw
|
|
|
Exterior only- Work in progress
Provide floor truss engineering for missing beam and hold downs
|
BLD-Foundation | 5/3/2018 | 5/4/2018 | 5/4/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 5/1/2018 | 5/2/2018 | 5/2/2018 | A | PASS |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion
|