BLD-Final | 10/1/2018 | 10/2/2018 | 10/2/2018 | A | PASS |
Jim Sly
|
|
|
Please call ahead for access instructions - Vinnie Phone #: ###-#### Blower door...3.9
|
DOC - Permit Finaled | 10/2/2018 | 10/2/2018 | 10/2/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 7/26/2018 | 7/27/2018 | 7/30/2018 | P | PASS |
Jim Sly
|
|
|
As late as possible, please call ahead // Kerry Phone #: ###-####
|
BLD-Framing/Rough-in | 7/26/2018 | 7/26/2018 | 7/26/2018 | P | PASS |
Jim Sly
|
|
|
Kerry Phone #: ###-####
|
BLD-Conference | 7/26/2018 | 7/27/2018 | 7/26/2018 | P | CANC |
Jim Sly
|
|
|
As late as posiblble // Kerry Phone #: ###-#### Inspection cancelled from web by: Keeley Wilson
|
BLD-Framing/Rough-in | 7/25/2018 | 7/25/2018 | 7/25/2018 | P | NR |
Jim Sly
|
|
|
Kerry Phone #: ###-#### Mechanical Red Tag still in window...3PM
|
BLD-Framing/Rough-in | 7/23/2018 | 7/24/2018 | 7/24/2018 | P | NR |
Jim Sly
|
|
|
Kerry Phone #: ###-#### Need Mech rough in approval.
|
BLD-Framing/Rough-in | 7/20/2018 | 7/23/2018 | 7/23/2018 | P | NR |
Jim Sly
|
|
|
late late pm- Kerry Phone #: ###-#### Need Mech rough-in approval.
|
BLD-Wall Bracing | 7/18/2018 | 7/18/2018 | 7/18/2018 | P | PASS |
Jim Sly
|
|
|
said he talked to you and set up for this AM // Carey Phone #: ###-####
|
BLD-Wall Bracing | 7/9/2018 | 7/9/2018 | 7/9/2018 | P | FAIL |
Jim Sly
|
|
|
Kerry Phone #: ###-#### C/N posted
|
BLD-Wall Bracing | 5/25/2018 | 5/30/2018 | 5/30/2018 | A | PART |
Jim Sly
|
|
|
Jose Phone #: ###-#### Should be FOUNDATION WALL...........OK.
|
BLD-Footing | 5/24/2018 | 5/25/2018 | 5/25/2018 | P | PART |
Jim Sly
|
|
|
Jose Phone #: ###-#### No forms or string lines pulled. Met with Jose. We found 3 pins and a witness stake (front East) Pour at own risk.
|