BLD-Final | 8/17/2018 | 8/20/2018 | 8/20/2018 | A | PASS |
Dave Hannah
|
|
|
Kirsten-please call to meet Phone #: ###-####
|
DOC - Permit Finaled | 8/20/2018 | 8/20/2018 | 8/20/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 5/16/2018 | 5/21/2018 | 5/21/2018 | A | PASS |
Dave Hannah
|
|
|
Kersten Phone #: ###-####
|
BLD-Framing/Rough-in | 5/15/2018 | 5/16/2018 | 5/16/2018 | P | PASS |
Dave Hannah
|
|
|
Kersten Phone #: ###-####
|
BLD-Framing/Rough-in | 5/11/2018 | 5/14/2018 | 5/14/2018 | A | PART |
Dave Hannah
|
|
|
Kirsten (downstairs section only) Phone #: ###-#### ok to cover cieling in kitchen
|
BLD-Conference | 5/1/2018 | 5/1/2018 | 5/1/2018 | P | DONE |
Dave Hannah
|
|
|
Call ahead // Kirsten Phone #: ###-####
|
BLD-Conference | 4/19/2018 | 4/19/2018 | 4/19/2018 | P | DONE |
Dave Hannah
|
|
|
Kirsten Phone #: ###-####
|
BLD-Conference | 4/16/2018 | 4/16/2018 | 4/17/2018 | P | DONE |
Dave Hannah
|
|
|
Darren-opened up subflooring in bathroom, check integrity of floor- call for access Phone #: ###-#### needs to reframe floor for bathroom
|
BLD-Other | 4/5/2018 | 4/5/2018 | 4/6/2018 | P | PART |
Dave Hannah
|
|
|
Please call ahead for access / Joist verification - Kersten Phone #: ###-#### floor ceiling framing 7 1/2 inch lvls for second fl ok to cover
|