BLD-Final | 5/21/2018 | 5/22/2018 | 5/22/2018 | A | PASS |
Dave Hannah
|
|
|
Mike -need both fire final and bld final in am Phone #: ###-####
|
FIRE-Final Inspection | 5/21/2018 | 5/22/2018 | 5/22/2018 | A | PASS |
Jim Page
|
|
|
No fire sprinkler modifications, no fire alarm modifications, fire extinguishers are in place with current inspection tags, emergency egress light will be installed in discussed locations in west corridor. Final life fire safety inspection for area of work complete.
Mike Phone #: ###-####- wants both fire final and bld final inspections done in am, due to parking problems
|
BLD-Final | 5/17/2018 | 5/18/2018 | 5/18/2018 | A | CANC |
Jim Storey
|
|
|
Mike-wants both inspections at same time Phone #: ###-####
|
FIRE-Final Inspection | 5/17/2018 | 5/18/2018 | 5/18/2018 | A | CANC |
Jim Page
|
|
|
Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 4/27/2018 | 5/1/2018 | 5/1/2018 | A | PASS |
Dave Hannah
|
|
|
Mike Phone #: ###-####
|
BLD-Conference | 4/25/2018 | 4/26/2018 | 4/26/2018 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-#### door frame in ok to cover
|