BLD-Final | 4/20/2020 | 4/21/2020 | 4/21/2020 | A | PASS |
Jim Storey
|
|
|
screened // Steve Phone #: ###-#### final ok pending sign offs p$z/achd/pw (TCH 4-27-20 inspections signed off)
|
FIRE-Final Inspection | 4/14/2020 | 4/15/2020 | 4/15/2020 | A | PASS |
Jim Page
|
|
|
Previously noted item has been corrected, no fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags. Permenant addressing is on site, GC will verify configuration of numbering with tenant (vertical or horizontal) after verification addressing will be installed. Signature provided on permit sign off card.
Screened- Steve Phone #: ###-####
|
BLD-Final | 4/13/2020 | 4/14/2020 | 4/14/2020 | A | NR |
Brandon Shaw
|
|
|
See fire/life...
|
FIRE-Final Inspection | 4/14/2020 | 4/14/2020 | 4/14/2020 | P | FAIL |
Jim Page
|
|
|
Emergency lights on the northeast side of the building did not function when AC power was isolated.
Screened- Steve Phone #: ###-####
|
BLD-Energy code compliance | 2/28/2020 | 3/2/2020 | 3/2/2020 | A | PART |
Jim Storey
|
|
|
Steve Phone #: ###-#### attic cert at final.
|
BLD-Energy code compliance | 2/12/2020 | 2/12/2020 | 2/12/2020 | P | PASS |
Jim Storey
|
|
|
Steve- plan mod on Hvac and Plumbing Phone #: ###-####
|
BLD-Energy code compliance | 2/11/2020 | 2/12/2020 | 2/12/2020 | A | DEFR |
Jim Storey
|
|
|
Steve- plan mod on Hvac and Plumbing Phone #: ###-####
|
BLD-Framing/Rough-in | 2/11/2020 | 2/11/2020 | 2/11/2020 | P | PART |
Jim Storey
|
|
|
Steve- plan mod on Hvac and Plumbing Phone #: ###-#### web braces a3.a4 b3.b3 6 in oc 80% top of trusses
|
BLD-Framing/Rough-in | 2/7/2020 | 2/7/2020 | 2/7/2020 | P | PASS |
Jim Storey
|
|
|
Steve- (plan mod for MECHANICAL) inspection for sealing Phone #: ###-#### air seal ok/ framing ok pending truss engineering/ ok to insulate.
|
BLD-Framing/Rough-in | 2/3/2020 | 2/6/2020 | 2/6/2020 | A | NR |
Jim Storey
|
|
|
Steve Phone #: ###-####
|
BLD-Framing/Rough-in | 1/27/2020 | 1/28/2020 | 1/28/2020 | A | NR |
Dave Hannah
|
|
|
Steve Phone #: ###-####
|
BLD-Framing/Rough-in | 1/21/2020 | 1/22/2020 | 1/22/2020 | A | PASS |
Jim Storey
|
|
|
Sheer & Roof Sheathing - Steve Phone #: ###-####
|
BLD-Foundation | 1/6/2020 | 1/7/2020 | 1/7/2020 | A | PASS |
Jim Storey
|
|
|
Dave - waterproofing Phone #: ###-####
|
BLD-Foundation | 12/27/2019 | 12/31/2019 | 12/31/2019 | A | CANC |
Dave Hannah
|
|
|
Steve - rebar Phone #: ###-####
|
BLD-Footing | 12/23/2019 | 12/27/2019 | 12/27/2019 | A | PASS |
Brandon Shaw
|
|
|
Steve Phone #: ###-####
|
BLD-Footing | 12/20/2019 | 12/24/2019 | 12/24/2019 | A | PASS |
Brandon Shaw
|
|
|
rebar- Steve Phone #: ###-####
|
BLD-Foundation | 12/20/2019 | 12/23/2019 | 12/23/2019 | P | CANC |
Dave Hannah
|
|
|
sTEVE - REBAR INSPECTION Phone #: ###-####
|