BLD-Final | 10/31/2018 | 10/31/2018 | 10/31/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 10/31/2018 | 10/31/2018 | 10/31/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 10/31/2018 | 10/31/2018 | 10/31/2018 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.98
|
BLD-Final | 10/26/2018 | 10/30/2018 | 10/30/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Blower Door Test Results | 10/30/2018 | 10/30/2018 | 10/30/2018 | A | NR |
Brandon Shaw
|
|
|
|
BLD-Final | 10/29/2018 | 10/29/2018 | 10/29/2018 | P | NR |
Brandon Shaw
|
|
|
Need PLM final... Need blower door and air seal cert...
|
BLD-Energy code compliance | 8/30/2018 | 8/30/2018 | 8/30/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Framing/Rough-in | 8/27/2018 | 8/28/2018 | 8/28/2018 | A | PASS |
Brandon Shaw
|
|
|
OK to insulate
|
BLD-Wall Bracing | 8/27/2018 | 8/28/2018 | 8/28/2018 | A | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Framing/Rough-in | 8/27/2018 | 8/27/2018 | 8/27/2018 | A | NH |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Wall Bracing | 8/27/2018 | 8/27/2018 | 8/27/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Other | 8/27/2018 | 8/27/2018 | 8/27/2018 | A | PASS |
Brandon Shaw
|
|
|
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Wall Bracing | 8/23/2018 | 8/24/2018 | 8/24/2018 | A | FAIL |
Brandon Shaw
|
|
|
Hold downs and floor to floor HD/Straps to be as per plans/locations- See pgs S2.0- 2.2 detail 10 See red paint
Do not cover exterior
|
BLD-Other | 8/23/2018 | 8/24/2018 | 8/24/2018 | A | PEND |
Brandon Shaw
|
|
|
Pending wall bracing corrections
Do not cover exterior
|
BLD-Framing/Rough-in | 8/22/2018 | 8/23/2018 | 8/23/2018 | A | FAIL |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick no exterior nail insp provide access. framing nr
|
BLD-Foundation | 5/3/2018 | 5/3/2018 | 5/4/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Foundation | 5/1/2018 | 5/1/2018 | 5/1/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|