BLD-Final | 11/5/2018 | 11/6/2018 | 11/6/2018 | P | PASS |
Mike Jordan
|
|
|
Cody Phone #: ###-####. Ok for perm occ. Exit sign in warehouse has been installed.
|
FIRE-Final Inspection | 11/5/2018 | 11/6/2018 | 11/6/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Exit sign to be installed in warehouse prior to the building inspection as discussed.
Cody Phone #: ###-####
|
BLD-Final | 10/29/2018 | 10/29/2018 | 10/29/2018 | A | PART |
Mike Jordan
|
|
|
Verified work from pictures over weekend. Fire should be finaled by today. Contractor has a few transitions from handrails to clean up and will call for final whwn completed. Temp occ still ok.
|
BLD-Final | 10/26/2018 | 10/27/2018 | 10/27/2018 | A | PART |
Mike Jordan
|
|
|
Ok for temp occ. Gurad rail issues and floor transitions have issues have been resolved.
|
BLD-Final | 10/25/2018 | 10/26/2018 | 10/26/2018 | P | NR |
Mike Jordan
|
|
|
Cody Phone #: ###-####. Needs to install all transitions from ramps to concrete floor and from 2 inch foam on elevated walkways to carpeted areas on ramps and stairs. Also noted that guardrails are only 40 inches from walking surface, Due to 2 inch foam being placed on plywood deck.
|
FIRE-Final Inspection | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | PART |
Troy Cobbley
|
|
|
A temporary for life safety is being given with the fire code and building code officials permission until the project related fire alarm permit is passed, the missing exit sign is provided in the warehouse and the racks are removed as discussed.
Cody Phone #: ###-####
|
FIRE-Conference | 10/25/2018 | 10/25/2018 | 10/25/2018 | P | DONE |
Troy Cobbley
|
|
|
Provide exit signs, exit discharge and emergency lights as per the approved plans, repair the existing emergency lights, provide occupant load sign, provide panic hardware where required, provide racking permit or remove racks, provide building address, remove all old fire alarm equipment and provide adequate strobe coverage with new equipment.
|
BLD-Conference | 10/23/2018 | 10/24/2018 | 10/24/2018 | A | DONE |
Mike Jordan
|
|
|
Cody Phone #: ###-####
|
BLD-Framing/Rough-in | 10/9/2018 | 10/10/2018 | 10/10/2018 | A | PASS |
Mike Jordan
|
|
|
Ben-plat form Phone #: ###-####. Remainder of interior steel stud framed walls and cross members for elevated platforms ok to cover. Contractor also geting close to job completion. reviewed several items for final. Noted issue is the main enterance wich are power operated sliding doors. Due to Occupancy type and load, panic hardware will be required.
|
BLD-Framing/Rough-in | 10/2/2018 | 10/3/2018 | 10/3/2018 | A | PART |
Brandon Shaw
|
|
|
High platform and access ramp farming... Center air bag and blocking for guard rail, at later date...
|
BLD-Framing/Rough-in | 9/13/2018 | 9/14/2018 | 9/14/2018 | A | PASS |
Mike Jordan
|
|
|
partial framing for platforms prior to sheathing // Ben Phone #: ###-####. Interior steel stud framing for platforms at kids corner area.
|
BLD-Conference | 8/23/2018 | 8/24/2018 | 8/24/2018 | A | DONE |
Mike Jordan
|
|
|
Ben Phone #: ###-####
|