Permit Information
Permit NumberBLD18-00979
StatusFinaled
Name DEBELLOY CONSTRUCTION
Site Address 10065 W ESHELMAN ST
Project NameDryden Duplex
Customer Number 
ePlanReviewYes
Description
(10058 W. Eshelman St. & 10065 W. Eshelman St.) ***Prescriptive component energy approach*** Permit for the construction of a new 2806 sq. ft. duplex. Unit A is 1403 sq. ft. with 3 bedrooms, 2.5 bathrooms, approximately 454 sq. ft. attached garage. Unit B is 1403 sq. ft. with 3 bedrooms, 2.5 bathrooms, approximately 454 sq. ft. attached garage. All work per the approved plans and any notations. R-1C zoning and setbacks per planning.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/27/20189/28/20189/28/2018PPASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by kevin debelloy
DOC - Permit Finaled9/28/20189/28/20189/28/2018PPASS
DetailsJim Sly
BLD-Grading Inspection9/27/20189/27/20189/27/2018APASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by kevin debelloy
BLD-Energy code compliance6/21/20186/21/20186/22/2018PPASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by kevin debelloy
BLD-Framing/Rough-in6/21/20186/21/20186/22/2018PPASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by kevin debelloy
BLD-Framing/Rough-in6/20/20186/21/20186/21/2018ACANC
DetailsJim Sly
Phone #: ###-#### >> Inspection requested via web by kevin debelloy Inspection cancelled from web by: kevin debelloy
BLD-Energy code compliance6/20/20186/21/20186/21/2018ACANC
DetailsJim Sly
Phone #: ###-#### >> Inspection requested via web by kevin debelloy Inspection cancelled from web by: kevin debelloy
BLD-Framing/Rough-in6/18/20186/19/20186/19/2018PPART
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by kevin debelloy. Needs to complete lateral bracing on trusses. Framing repairs in progress. Ok to insulate. Also noted to contractor that draft stops in attic also need to be inspected.
BLD-Framing/Rough-in6/18/20186/18/20186/18/2018PFAIL
DetailsMike Jordan
Provide truss engineering. Fire block at top of all double walls. Need to provide continous 1hr. assembly were floor trusses sit on 1hr. wall. Will need to insulate behind tubs upstairs. Correction notice posted.
BLD-Framing/Rough-in6/18/20186/18/20186/18/2018PCANC
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by kevin debelloy.
BLD-Wall Bracing5/24/20185/25/20185/25/2018APASS
DetailsJim Sly
For shear Phone #: ###-#### Inspection requested via web by kevin debelloy
BLD-Foundation4/26/20184/26/20184/26/2018APASS
DetailsJim Sly
pour is set for 12:30 Phone #: ###-#### Inspection requested via web by kevin debelloy
BLD-Footing4/23/20184/24/20184/24/2018APASS
DetailsJim Sly
pour is scheduled for 12:30 should be ready for inspections by 11:00 Phone #: ###-#### Inspection requested via web by kevin debelloy