BLD-Blower Door Test Results | 7/23/2019 | 7/23/2019 | 7/23/2019 | P | DONE |
Tell Riley
|
|
|
10033 Eshelman--4.6 ACH50//1000cfm @ 50 Pa
10021 Eshelman--4.6 ACH50//1000cfm @ 50 Pa
|
BLD-Final | 7/22/2019 | 7/23/2019 | 7/23/2019 | A | PASS |
Tell Riley
|
|
|
call me for entry code , blower door test has passed on both units Phone #: ###-#### Inspection requested via web by kevin debelloy
|
DOC - Permit Finaled | 7/23/2019 | 7/23/2019 | 7/23/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 7/18/2019 | 7/19/2019 | 7/19/2019 | A | NR |
Tell Riley
|
|
|
please call before arrival so I can meet you there to gain access.
Thanks ~Kevin ###-#### Phone #: ###-#### Inspection requested via web by kevin debelloy//need blower door tests//
|
BLD-Energy code compliance | 5/14/2019 | 5/14/2019 | 5/14/2019 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy
|
BLD-Framing/Rough-in | 5/14/2019 | 5/14/2019 | 5/14/2019 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy
|
BLD-Framing/Rough-in | 5/9/2019 | 5/9/2019 | 5/9/2019 | A | FAIL |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy C/N posted.
|
BLD-Wall Bracing | 5/8/2019 | 5/8/2019 | 5/8/2019 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy
|
BLD-Foundation | 3/18/2019 | 3/18/2019 | 3/19/2019 | P | DONE |
Tony Young
|
|
|
Pour is set for 1:30 should be ready for inspection anytime today Phone #: ###-#### Inspection requested via web by kevin debelloy
|
BLD-Footing | 3/14/2019 | 3/14/2019 | 3/14/2019 | P | PASS |
Jim Sly
|
|
|
Footings pour is scheduled for 1:30 and is ready anytime for inspection before that Phone #: ###-#### Inspection requested via web by kevin debelloy
|