BLD-Final | 6/27/2018 | 6/28/2018 | 7/2/2018 | A | PASS |
Dave Hannah
|
|
|
Robert Phone #: ###-####
|
BLD-Final | 6/15/2018 | 6/15/2018 | 6/15/2018 | A | PART |
Jim Storey
|
|
|
Ok for temp occupancy. Fiinal occupancy pending complition of plan mod submitted for mechanical penetrations. Reinspection required for final.
|
BLD-Final | 6/13/2018 | 6/14/2018 | 6/14/2018 | P | FAIL |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Robert Snow openings above ceilling at 1hr wall need submited for protection and permits.
|
FIRE-Final Inspection | 6/12/2018 | 6/13/2018 | 6/13/2018 | P | PASS |
Jim Page
|
|
|
Final life fire safety inspection for scope of work complete.
I need to know if we need to test the fire alarm system as part of this inspection so I can coordinate with Micron''s fire system folks. Please call me and let me know. ###-#### Phone #: ###-#### Inspection requested via web by Robert Snow
|
BLD-Framing/Rough-in | 5/2/2018 | 5/2/2018 | 5/2/2018 | P | PART |
Jim Storey
|
|
|
This project is in Building 27 . Phone #: ###-#### Inspection requested via web by Robert Snow wall framing pass ok to cover// c/n 1 hr fire barrior opening protection of thur penatrations needs addressed.
|