BLD-Final | 10/26/2018 | 10/26/2018 | 10/26/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 10/26/2018 | 10/26/2018 | 10/26/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 10/26/2018 | 10/26/2018 | 10/26/2018 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.99
|
BLD-Final | 10/8/2018 | 10/9/2018 | 10/9/2018 | A | FAIL |
Brandon Shaw
|
|
|
R-3 insulation needed at hot side of suppy, from water heater to house... Caulking needed at water heater vent penetration... Blower door test results to be posted... Egerss window, bedroom 3, to be no more than 44" from finished floor...
|
BLD-Energy code compliance | 8/13/2018 | 8/14/2018 | 8/13/2018 | A | PASS |
Brandon Shaw
|
|
|
Gus Phone #: ###-####
|
BLD-Energy code compliance | 8/9/2018 | 8/10/2018 | 8/9/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Other | 8/8/2018 | 8/10/2018 | 8/9/2018 | A | PASS |
Brandon Shaw
|
|
|
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Framing/Rough-in | 8/7/2018 | 8/8/2018 | 8/8/2018 | A | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
OK to insulate
|
BLD-Framing/Rough-in | 8/6/2018 | 8/6/2018 | 8/6/2018 | P | FAIL |
Brandon Shaw
|
|
|
See correction notice
OK to insulate
|
BLD-Wall Bracing | 7/23/2018 | 7/23/2018 | 7/23/2018 | P | PEND |
Brandon Shaw
|
|
|
Interior shear, hold downs and anchor bolts to be tightened down
|
BLD-Wall Bracing | 7/16/2018 | 7/16/2018 | 7/16/2018 | A | FAIL |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick covered with out insp.
|
BLD-Foundation | 6/5/2018 | 6/6/2018 | 6/7/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 6/5/2018 | 6/5/2018 | 6/5/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|