BLD-Final | 8/7/2019 | 8/8/2019 | 8/8/2019 | A | PASS |
Tell Riley
|
|
|
Steven Phone #: ###-####//platforms added under egress windows for code compliance//bedroom that is not code compliant is boarded up--not readily accessible and will require sufficient effort to access//bonus room addition is boarded up and not readily accessible--and will require significant effort to access//plan modification will need to be provided and approved to use space that is boarded off//these areas will need inspection prior to approved use//
|
DOC - Permit Finaled | 8/8/2019 | 8/8/2019 | 8/8/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 8/5/2019 | 8/5/2019 | 8/5/2019 | P | FAIL |
Tell Riley
|
|
|
Steven Phone #: ###-####//correction notice issued//added space above garage is not on the plans and does not have stair or ramp access//midlevel room does not meet code requirements for bedroom// lower level bedrooms egress windows are to high//
|
BLD-Final | 8/2/2019 | 8/2/2019 | 8/2/2019 | P | FAIL |
Tell Riley
|
|
|
Steven Phone #: ###-####//talked to electrical inspector--inspection failed//need plumbing final as well// will need to look into bedroom with low ceiling height-and play room in bonus area///
|
BLD-Final | 5/29/2019 | 5/29/2019 | 5/29/2019 | P | DONE |
Jim Sly
|
|
|
Steven Phone #: ###-#### Walk thru with Steve........
|
BLD-Energy code compliance | 11/14/2018 | 11/15/2018 | 11/15/2018 | A | PASS |
Jim Sly
|
|
|
Steven Phone #: ###-####
|
BLD-Framing/Rough-in | 11/8/2018 | 11/13/2018 | 11/13/2018 | A | PASS |
Jim Sly
|
|
|
Steven Phone #: ###-####
|
BLD-Conference | 10/24/2018 | 10/24/2018 | 10/25/2018 | P | DONE |
Jim Sly
|
|
|
Steven Phone #: ###-####
|
BLD-Conference | 8/15/2018 | 8/15/2018 | 8/15/2018 | P | DONE |
Jim Sly
|
|
|
Call ahead with a rough time of meeting there // Steven Phone #: ###-####
|