BLD-Final | 6/5/2019 | 6/6/2019 | 6/6/2019 | A | PASS |
Brandon Shaw
|
|
|
Re-inspection for final for C of O Original final inspection done by Dave Hannah Branden out Phone #: ###-#### Inspection requested via web by Robert Bruno
|
DOC - Permit Finaled | 6/6/2019 | 6/6/2019 | 6/6/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 4/29/2019 | 4/30/2019 | 4/30/2019 | A | FAIL |
Dave Hannah
|
|
|
Call Builder for access or use garage code of 4908.00 Phone #: ###-#### Inspection requested via web by Admin Assistant needs hillside final air seal sign off and egress window in master bedroom
|
BLD-Aging Inspection | 4/4/2019 | 4/4/2019 | 4/4/2019 | | CANC |
Brandon Shaw
|
|
|
|
BLD-Conference | 4/3/2019 | 4/3/2019 | 4/3/2019 | A | DEFR |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Aging Inspection | 4/3/2019 | 4/3/2019 | 4/3/2019 | | DEFR |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Energy code compliance | 11/19/2018 | 11/20/2018 | 11/20/2018 | A | PASS |
Brandon Shaw
|
|
|
Wall Insulation Inspection. Please schedule for the morning. Phone #: ###-#### Inspection requested via web by Admin Assistant
|
BLD-Energy code compliance | 11/19/2018 | 11/20/2018 | 11/19/2018 | P | CANC |
Brandon Shaw
|
|
|
Section Wall Insulation Inspection. Please call with any questions. Phone #: ###-#### >> Inspection requested via web by Admin Assistant Inspection cancelled from web by: Admin Assistant
|
BLD-Framing/Rough-in | 11/16/2018 | 11/19/2018 | 11/19/2018 | A | CANC |
Jim Sly
|
|
|
Please schedule this first thing and call Robert with any questions or issues. ###-#### Phone #: ###-#### >> Inspection requested via web by Admin Assistant Inspection cancelled from web by: Admin Assistant
|
BLD-Framing/Rough-in | 11/16/2018 | 11/16/2018 | 11/16/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 11/16/2018 | 11/19/2018 | 11/16/2018 | A | CANC |
Brandon Shaw
|
|
|
Please call with any questions. Phone #: ###-#### >> Inspection requested via web by Admin Assistant Inspection cancelled from web by: Admin Assistant
|
BLD-Wall Bracing | 10/1/2018 | 10/2/2018 | 10/2/2018 | A | PASS |
Mike Jordan
|
|
|
Steve Phone #: ###-####
|
BLD-Footing | 6/27/2018 | 6/27/2018 | 6/27/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Foundation | 6/1/2018 | 6/1/2018 | 6/1/2018 | P | PART |
Brandon Shaw
|
|
|
Work in progress
Basement walls
|
BLD-Footing | 5/24/2018 | 5/24/2018 | 5/24/2018 | P | PART |
Brandon Shaw
|
|
|
Set backs taken from Lots 1/2 property line only, pour at own risk. Basement footing
|