BLD-Final | 10/3/2018 | 10/3/2018 | 10/3/2018 | P | PASS |
Jim Sly
|
|
|
Please give me a call this morning if possible to schedule an approximate time of inspection so i can meet up with you. Thanks Phone #: ###-#### Inspection requested via web by Ryan Allen
|
DOC - Permit Finaled | 10/3/2018 | 10/3/2018 | 10/3/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Conference | 7/24/2018 | 7/24/2018 | 7/24/2018 | P | DONE |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 7/23/2018 | 7/23/2018 | 7/23/2018 | P | PASS |
Jim Sly
|
|
|
Inspection of Insulation install. Phone #: ###-#### Inspection requested via web by Ryan Allen
|
BLD-Framing/Rough-in | 7/17/2018 | 7/18/2018 | 7/19/2018 | P | PASS |
Jim Sly
|
|
|
HVAC inspection will be about 1. Hoping to have this inspection soon thereafter. Please call prior to heading our way. Thank you very much. Phone #: ###-#### Inspection requested via web by Ryan Allen
|
BLD-Wall Bracing | 6/26/2018 | 6/27/2018 | 6/27/2018 | A | PASS |
Jim Sly
|
|
|
Inspection of sheer walls on new garage additions prior to house wrapping Phone #: ###-#### Inspection requested via web by Ryan Allen
|
BLD-Conference | 6/11/2018 | 6/11/2018 | 6/11/2018 | A | DONE |
Mike Jordan
|
|
|
Would like to discuss basement framing and fire barrier between floors. Please give me a call 15 minutes or so ahead of visit as I will be off site but will shoot right over. Thanks Phone #: ###-#### Inspection requested via web by Ryan Allen. Went over floor ceiling issues with contractor.
|
BLD-Foundation | 5/24/2018 | 5/25/2018 | 5/25/2018 | A | PASS |
Jim Sly
|
|
|
AAron-wants to have about 11am because he has concrete at noon Phone #: ###-####
|
BLD-Foundation | 5/18/2018 | 5/21/2018 | 5/21/2018 | A | PART |
Jim Sly
|
|
|
Aaron Phone #: ###-#### Footing for garage addition and garage extension..........stairway to basement......OK.
|