Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD18-01325
StatusFinaled
Name ST LUKES HEALTH SYSTEM LTD
Site Address 703 S AMERICANA BLVD Unit: 150
Project NamePsychiatric Wellness Service R
Customer Number 
ePlanReviewYes
Description
(ST. LUKES PSYCHIATRIC WELLNESS - UNIT #150) Permit for tenant improvements to an existing 9,819 square foot tenant space in a IIIB, fully sprinklered Building built in 2001 under the 1997 UBC. Building was fully sprinklered for area increase. Approximately 2700 square feet will remain unoccupied space as to allow egress (Improvements to this area will require a separate permit). C of O is for occupied space only. Improvements are to convert approxiatemly 821 square feet of previously open space into Office Area, Housekeeping Closet and Reception, modify a room into a Conference Room, modify current Reception Area into a Work Station, modify existing Office and Work Area into (3) Offices. Finishes in Hallway and select Offices will be updated. DOOR 124 ON PAGE A-111 REQUIRES FURTHER INFORMATION THAT WILL BE PROVIDED TO CDM PRIOR TO INSTALLATION. No exterior work is proposed. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. ***BJM***
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/1/201811/2/201811/2/2018APASS
DetailsMike Jordan
Kelly Phone #: ###-####. Ok for perm occ. No card on site to sign.
FIRE-Final Inspection10/26/201810/29/201810/29/2018APASS
DetailsJim Page
Final life fire safety inspection for area of work complete.

Rick Phone #: ###-####
FIRE-Final Inspection10/17/201810/18/201810/18/2018AFAIL
DetailsJim Page
FIR permit for associated fire alarm modifications (FIR18-00483) in area of work needs to be finaled before life fire safety inspection can be completed.

Kelly Phone #: ###-####
BLD-Ceiling Grid Inspection8/2/20188/2/20188/2/2018PPASS
DetailsDave Hannah
Kelly Phone #: ###-####
BLD-Wall cover7/2/20187/3/20187/3/2018APASS
DetailsDave Hannah
Kelly Phone #: ###-####