BLD-Final | 3/26/2019 | 3/27/2019 | 3/27/2019 | A | PASS |
Mike Jordan
|
|
|
Overland Taco Bell Phone #: ###-#### Inspection requested via web by Sean Worthington. Ok for perm occ.
|
BLD-Final | 1/3/2019 | 1/4/2019 | 1/4/2019 | P | PEND |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sean Worthington. Will be ok for Temp. occ. once public works signs off. Will be ok for perm. occ. once zoning signs perm.
|
FIRE-Final Inspection | 1/2/2019 | 1/3/2019 | 1/3/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
Sean ###-####
|
FIRE-Final Inspection | 12/28/2018 | 1/2/2019 | 1/2/2019 | A | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok to final when the project related fire suppression permit is finaled.
Sean Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 12/17/2018 | 12/18/2018 | 12/18/2018 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sean Worthington
|
BLD-Wall Bracing | 11/19/2018 | 11/19/2018 | 11/19/2018 | P | PASS |
Mike Jordan
|
|
|
Late pm if possible. Thank you. Interior shear. Phone #: ###-#### Inspection requested via web by Sean Worthington
|
BLD-Energy code compliance | 11/15/2018 | 11/16/2018 | 11/16/2018 | A | PASS |
Mike Jordan
|
|
|
Wall insulation Phone #: ###-#### Inspection requested via web by Sean Worthington
|
BLD-Energy code compliance | 11/14/2018 | 11/15/2018 | 11/15/2018 | A | PASS |
Mike Jordan
|
|
|
Marv''s said that they will be complete with energy seal by 10:30. Thank you Phone #: ###-#### Inspection requested via web by Sean Worthington. airseal ok.
|
BLD-Framing/Rough-in | 11/13/2018 | 11/14/2018 | 11/14/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sean Worthington
|
BLD-Foundation | 11/12/2018 | 11/13/2018 | 11/13/2018 | P | DEFR |
Mike Jordan
|
|
|
Rebar inspection for the trash enclosure CMU. Phone #: ###-#### Inspection requested via web by Sean Worthington
|
BLD-Framing/Rough-in | 11/5/2018 | 11/5/2018 | 11/5/2018 | P | PASS |
Mike Jordan
|
|
|
Exterior overbuild so we can cover. Phone #: ###-#### Inspection requested via web by Sean Worthington
|
BLD-Wall Bracing | 11/1/2018 | 11/2/2018 | 11/2/2018 | A | PASS |
Mike Jordan
|
|
|
Inspect shear wall nailing Phone #: ###-#### Inspection requested via web by Sean Worthington. Exterior shear nailing only ok.
|
BLD-Wall Bracing | 10/31/2018 | 11/1/2018 | 11/1/2018 | A | PART |
Mike Jordan
|
|
|
Shear // Dave Phone #: ###-####. roof nailing and hardware ok to cover. Needs to install missing hold downs and provide the additional rows of nailing at holdown locations as per endwall details. Enginner of record to provide alternate nailing detail for stud nailing at corners.
|
BLD-Concrete | 10/5/2018 | 10/8/2018 | 10/8/2018 | A | PART |
Mike Jordan
|
|
|
drive thru- Sean Phone #: ###-####. Welded wire mesh for exterior concrete slab on grade for drive through. Noted some clearance issues. Contractor to fix prior to concrete placement.
|
BLD-Other | 10/3/2018 | 10/4/2018 | 10/4/2018 | P | PASS |
Brandon Shaw
|
|
|
BUILDING SLAB // SEAN Phone #: ###-####
|
BLD-Footing | 9/24/2018 | 9/25/2018 | 9/25/2018 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sean Worthington. Mono pour for dumpster enclosure ok.
|
BLD-Energy code compliance | 9/18/2018 | 9/18/2018 | 9/18/2018 | A | PASS |
Mike Jordan
|
|
|
e Early if possible Phone #: ###-#### Inspection requested via web by Sean Worthington. Rigid insulation on interior of stemwall.
|
BLD-Foundation | 9/12/2018 | 9/13/2018 | 9/13/2018 | A | PART |
Mike Jordan
|
|
|
Late am. Thank you Phone #: ###-#### Inspection requested via web by Sean Worthington. Work in progres on interior mat footing for shear wall. Will be ok for concrete once special inspection has approved placement.
|
BLD-Foundation | 9/11/2018 | 9/12/2018 | 9/12/2018 | P | PART |
Jim Sly
|
|
|
Early pm if possible. Thank you. Phone #: ###-#### Inspection requested via web by Sean Worthington OK pending MTI special inspection, tests and approvals.
|
BLD-Foundation | 9/10/2018 | 9/11/2018 | 9/11/2018 | P | CANC |
Dave Hannah
|
|
|
Late pm if possible. Thank you. Phone #: ###-#### >> Inspection requested via web by Sean Worthington Inspection cancelled from web by: Sean Worthington
|
BLD-Foundation | 9/10/2018 | 9/11/2018 | 9/10/2018 | A | CANC |
Mike Jordan
|
|
|
Late am if possible. Thank you. We hope to pour at 2 pm. Phone #: ###-#### >> Inspection requested via web by Sean Worthington Inspection cancelled from web by: Sean Worthington
|
BLD-Footing | 8/29/2018 | 8/29/2018 | 8/29/2018 | P | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sean Worthington. Work in progress. Will have special inspection.
|
BLD-Conference | 8/20/2018 | 8/20/2018 | 8/20/2018 | P | DONE |
Bob Archibald
|
|
|
Received and approved engineering for below grade materials.
|
BLD-Conference | 8/16/2018 | 8/16/2018 | 8/16/2018 | P | PEND |
Bob Archibald
|
|
|
Complaint that basement footing foundation being left inplace and not to be removed during demolition Spoke with demo contractor and requested a stamped document from design professional indicating that existing/remaining basement footings/walls will not compromise new construction and that failure to receive applicable documentation will result in removal.
|