BLD-Aging Inspection | 6/21/2019 | 6/21/2019 | 6/21/2019 | | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 6/21/2019 | 6/21/2019 | 6/21/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 2/7/2019 | 2/7/2019 | 2/7/2019 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Final | 2/5/2019 | 2/5/2019 | 2/5/2019 | P | FAIL |
Mike Jordan
|
|
|
Scott Phone #: ###-####. Handrails mounted to high, provide tempered glazing next to shower upstairs. Provide the correct address. Provide min 36 inch high half wall next to stairs.
|
BLD-Energy code compliance | 11/28/2018 | 11/28/2018 | 11/28/2018 | P | PASS |
Mike Jordan
|
|
|
mateo Phone #: ###-####
|
BLD-Framing/Rough-in | 11/21/2018 | 11/21/2018 | 11/21/2018 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Framing/Rough-in | 11/9/2018 | 11/9/2018 | 11/9/2018 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown. Provide truss engineering. Complete install of break away clips on 2hr. wall. Provide hangars for floor joist in garage to paralam connection. Install addtional studs under 2ply truss upstairs and the H2.5. Complete 2hr assembly at soffits... Correction notice posted.
|
BLD-Framing/Rough-in | 11/7/2018 | 11/7/2018 | 11/7/2018 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Wall Bracing | 10/23/2018 | 10/23/2018 | 10/23/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Concrete | 9/19/2018 | 9/19/2018 | 9/19/2018 | P | PASS |
Mike Jordan
|
|
|
Thickened footings Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Energy code compliance | 9/19/2018 | 9/19/2018 | 9/19/2018 | P | PASS |
Mike Jordan
|
|
|
Foundation insulation Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Energy code compliance | 9/6/2018 | 9/6/2018 | 9/6/2018 | P | PART |
Brandon Shaw
|
|
|
Foundation insulation.
|
BLD-Energy code compliance | 9/4/2018 | 9/4/2018 | 9/4/2018 | A | NR |
Mike Jordan
|
|
|
Foundation Insulation Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD-Foundation | 8/27/2018 | 8/28/2018 | 8/28/2018 | P | PASS |
Mike Jordan
|
|
|
foundation // Dane Phone #: ###-####
|
BLD-Footing | 8/27/2018 | 8/27/2018 | 8/27/2018 | P | PART |
Mike Jordan
|
|
|
Latest as possible - Wes Phone #: ###-####
|