BLD-Final | 2/13/2019 | 2/14/2019 | 2/14/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Mark Steen
|
FIRE-Final Inspection | 2/12/2019 | 2/13/2019 | 2/13/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
Phone #: ###-#### Inspection requested via web by Mark Steen
|
BLD-Framing/Rough-in | 11/15/2018 | 11/15/2018 | 11/16/2018 | P | PASS |
Dave Hannah
|
|
|
Per Brandon, a courtesy inspection should also occur for Dave Hannah. Phone #: ###-#### Inspection requested via web by Mark Steen
|
BLD-Framing/Rough-in | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | PART |
Brandon Shaw
|
|
|
Pending trades rough-in...
|
BLD-Foundation | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | PASS |
Brandon Shaw
|
|
|
Small canopy in alley.
|
BLD-Framing/Rough-in | 9/25/2018 | 9/26/2018 | 9/26/2018 | A | PASS |
Dave Hannah
|
|
|
Metal stud framing at restrooms and shower. Also note, we are preparing to retrofit existing wood framing at mezzanine deck. A quick familiarization of existing conditions may help us all as we upgrade beams and hardware connections. Thanks Phone #: ###-#### Inspection requested via web by Mark Steen ok to cover bath rooms
|