BLD-Final | 5/11/2020 | 5/12/2020 | 5/12/2020 | P | PASS |
Tony Young
|
|
|
Eric *screened* Phone #: ###-####
|
DOC - Permit Finaled | 5/12/2020 | 5/12/2020 | 5/12/2020 | P | PASS |
Tony Young
|
|
|
|
BLD-Blower Door Test Results | 5/12/2020 | 5/12/2020 | 5/12/2020 | P | DONE |
Tony Young
|
|
|
Eric *screened* Phone #: ###-####/// 3.99
|
BLD-Final | 4/14/2020 | 4/15/2020 | 4/15/2020 | A | FAIL |
Tony Young
|
|
|
Screened- Erick Phone #: ###-####// c/n posted,, needs plans,, guard rails on basement stairs, alley window well,, if garage door is on plans, needs energy calcs, tempered glass, if not on plans, need to re-submit for plan review,, garage steps into house per min. code, fire caulking, tempered glass within 24" of door, blower door test results,, etc
|
BLD-Aging Inspection | 4/2/2020 | 4/2/2020 | 4/8/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 4/1/2020 | 4/1/2020 | 4/8/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Energy code compliance | 11/19/2019 | 11/19/2019 | 11/19/2019 | P | PASS |
Tony Young
|
|
|
Eric Phone #: ###-####
|
BLD-Framing/Rough-in | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | PART |
Dave Hannah
|
|
|
Eric Phone #: ###-#### ok to insulate but needs to fire blcok walls in basement and add a header in bearing wall in basement ground fl strape beam front rm to dbl plate second floor needs to strape dbl top plate and get ok to add load to bottom cord of truss by mec equp
|
BLD-Wall Bracing | 10/4/2019 | 10/7/2019 | 10/7/2019 | A | PASS |
Brandon Shaw
|
|
|
Eric Phone #: ###-####
|
BLD-Foundation | 7/8/2019 | 7/8/2019 | 7/8/2019 | P | PASS |
Jim Storey
|
|
|
wall // Surgio Phone #: ###-####
|
BLD-Footing | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | PASS |
Brandon Shaw
|
|
|
See permit BLD18- 0072 for previous inspections- basement footing and foundation... Footing inspection for revised floor plan...
|