Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD18-01938
StatusFinaled
Name CARROLL CONSTRUCTION
Site Address 910 W AMITY RD
Project NameAmity Place
Customer Number 
ePlanReviewYes
Description
(AMITY PLACE) Permit is to remodel the front office area approx. 2,912 sq. ft. and the rear restroom area within an existing building. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames and relocate select to new location, removal of select suspended acoustic ceiling, construction of interior non-bearing walls to create a larger conference room, (3) larger offices, a laundry room and an accessible restroom with an accessible shower, select new rated wall infill, select new suspended acoustic and gypsum ceiling, light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is partially Fire Sprinklered (approx.. 7,500 sq. ft. Front office/warehouse area are sprinklered and the rear storage area and two story building is Not sprinklered). Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/19/201810/22/201810/22/2018APASS
DetailsJim Sly
###-####-Aaron
DOC - Permit Finaled10/22/201810/22/201810/22/2018PPASS
DetailsJim Sly
FIRE-Final Inspection10/16/201810/17/201810/17/2018APASS
DetailsJim Page
Previously noted deficiencies on the fire sprinkler system have been corrected, final life fire safety inspection for area of work complete.

Aaron Phone #: ###-####
FIRE-Final Inspection10/5/201810/5/201810/5/2018AFAIL
DetailsJim Page
Provide fire sprinkler in the closet between the restrooms. Provide fire sprinkler that is missing in vault, provide fire sprinkler under overhead door.
FIRE-Final Inspection10/3/201810/4/201810/4/2018ANR
DetailsJim Page
Spoke with Boise Fire Department about some noted issues in the fire sprinklered are that was outside the scope of work of the fire sprinkler contractor. A conference will be scheduled to verify discussed locations. Life safety is not passed at this time.



Aaron Phone #: ###-####
BLD-Final10/3/201810/4/201810/4/2018PNR
DetailsJim Sly
Aaron Phone #: ###-####
Need Electrical and Fire final inspection.
BLD-Ceiling Grid Inspection9/26/20189/27/20189/27/2018PPASS
DetailsJim Storey
Ken Phone #: ###-####
BLD-Framing/Rough-in9/12/20189/13/20189/13/2018APASS
DetailsDave Hannah
Kem Phone #: ###-####