BLD-Final | 11/29/2018 | 11/30/2018 | 11/30/2018 | P | PASS |
Brandon Shaw
|
|
|
as early as possible // sean Phone #: ###-####
|
DOC - Permit Finaled | 11/30/2018 | 11/30/2018 | 11/30/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 11/30/2018 | 11/30/2018 | 11/30/2018 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 4.62
|
BLD-Final | 11/28/2018 | 11/29/2018 | 11/29/2018 | A | FAIL |
Mike Jordan
|
|
|
Call for access- Shawn Phone #: ###-####. Provide tempered glazing in bathroom upstairs. Provide smoke and smoke/carbon detectors in den downstairs.(This room has a closet and egress window and shows s/c detectors on approved plan.) Provide landings at door in master bedroom and landing/step in door to garage.
|
BLD-Energy code compliance | 9/17/2018 | 9/18/2018 | 9/18/2018 | A | PASS |
Jim Sly
|
|
|
Shawn Phone #: ###-####
|
BLD-Framing/Rough-in | 9/13/2018 | 9/13/2018 | 9/13/2018 | P | PASS |
Jim Sly
|
|
|
Shawn Phone #: ###-####
|
BLD-Wall Bracing | 8/31/2018 | 9/4/2018 | 9/4/2018 | A | PASS |
Jim Sly
|
|
|
Sean Phone #: ###-####
|
BLD-Energy code compliance | 7/27/2018 | 7/30/2018 | 7/30/2018 | A | NR |
Jim Sly
|
|
|
Shane Phone #: ###-#### No insulation installed yet.
|
BLD-Framing/Rough-in | 7/27/2018 | 7/30/2018 | 7/30/2018 | A | NR |
Jim Sly
|
|
|
Shane Phone #: ###-#### No framing done yet........
|
BLD-Foundation | 7/24/2018 | 7/24/2018 | 7/24/2018 | A | PASS |
Jim Sly
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 7/23/2018 | 7/23/2018 | 7/23/2018 | A | PASS |
Jim Sly
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 7/13/2018 | 7/16/2018 | 7/16/2018 | P | NR |
Tony Young
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Lira
|