BLD-Final | 9/11/2019 | 9/13/2019 | 9/13/2019 | A | PASS |
Brandon Shaw
|
|
|
Just realized you need to look at exterior handrails please give 30 minutes notice Phone #: ###-#### Inspection requested via web by bryan murdoch
|
DOC - Permit Finaled | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 3/11/2019 | 3/11/2019 | 3/11/2019 | P | PEND |
Dave Hannah
|
|
|
Please call me 30 minutes prior to going thank you Phone #: ###-#### Inspection requested via web by bryan murdoch inside of home is ok but needs ext gaurd rails and drive way
|
BLD-Conference | 3/4/2019 | 3/4/2019 | 3/4/2019 | P | DONE |
Brandon Shaw
|
|
|
Courtesy inspection please. Need to check over the home and discuss any bonds needed please. Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Final | 2/27/2019 | 3/1/2019 | 3/1/2019 | A | PEND |
Jim Sly
|
|
|
Need temporary occupancy until driveway can be poured due to weather Phone #: ###-#### Inspection requested via web by bryan murdoch Need 2 Electr. Permits Finaled. Blessing from Public Works. and Bond.
|
BLD-Energy code compliance | 11/29/2018 | 11/29/2018 | 11/29/2018 | P | PASS |
Dave Hannah
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Framing/Rough-in | 11/26/2018 | 11/26/2018 | 11/26/2018 | A | PART |
Dave Hannah
|
|
|
Framer said he took the truss engineering out there sorry about that Phone #: ###-#### Inspection requested via web by bryan murdoch ok to insulate c/n on site
|
BLD-Framing/Rough-in | 11/23/2018 | 11/23/2018 | 11/23/2018 | P | PEND |
Brandon Shaw
|
|
|
No Truss Engineering on site...
|
BLD-Wall Bracing | 11/20/2018 | 11/21/2018 | 11/21/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Foundation | 8/7/2018 | 8/8/2018 | 8/8/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 7/24/2018 | 7/25/2018 | 7/25/2018 | A | PASS |
Dave Hannah
|
|
|
Eric Phone #: ###-####
|