BLD-Blower Door Test Results | 1/9/2019 | 1/9/2019 | 1/9/2019 | P | PASS |
Dave Hannah
|
|
|
4.0
|
BLD-Final | 1/9/2019 | 1/9/2019 | 1/9/2019 | P | PASS |
Dave Hannah
|
|
|
A bond will be completed early this morning for the landscaping/ hillside. Tisha should have all the info. Garage code 1905 Phone #: ###-#### Inspection requested via web by bryan murdoch ***bond have been recorded. blh ###-####*** blower door 4.0
|
DOC - Permit Finaled | 1/9/2019 | 1/9/2019 | 1/9/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 1/7/2019 | 1/8/2019 | 1/8/2019 | P | NR |
Dave Hannah
|
|
|
Garage code 1905 Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Final | 1/4/2019 | 1/4/2019 | 1/4/2019 | P | CANC |
Tony Young
|
|
|
Fire should pass after lunch Phone #: ###-#### >> Inspection requested via web by bryan murdoch Inspection cancelled from web by: bryan murdoch
|
BLD-Energy code compliance | 10/15/2018 | 10/16/2018 | 10/16/2018 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Framing/Rough-in | 10/12/2018 | 10/12/2018 | 10/12/2018 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
OK to insulate
|
BLD-Framing/Rough-in | 10/9/2018 | 10/9/2018 | 10/9/2018 | P | CANC |
Brandon Shaw
|
|
|
Previous inspection entry should be Fail, not Cancel.
|
BLD-Framing/Rough-in | 10/9/2018 | 10/9/2018 | 10/9/2018 | P | CANC |
Brandon Shaw
|
|
|
Need straps at breaks in double top plates... Provide continuous bearing to footing for 3 ply beam, supporting 3 ply box truss, up stairs hallway... Need air/foam seal... See red paint
|
BLD-Wall Bracing | 10/9/2018 | 10/9/2018 | 10/9/2018 | P | PEND |
Brandon Shaw
|
|
|
Interior shear to be as per plans...
See red paint
|
BLD-Wall Bracing | 10/2/2018 | 10/3/2018 | 10/3/2018 | A | PART |
Jim Storey
|
|
|
Can you also please do a courtesy framing inspection while you were there so we can fix any items that may need to be done thank you Phone #: ###-#### Inspection requested via web by bryan murdoch exterior ok
|
BLD-Foundation | 8/9/2018 | 8/9/2018 | 8/9/2018 | P | DONE |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Foundation | 8/8/2018 | 8/8/2018 | 8/8/2018 | P | PART |
Mike Jordan
|
|
|
As late as possible Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo. Basement walls ok. Noted footing on garage foundation had vertical reinforcement at 4ft. oc. Approved plans and engineering shows verts at 18 inches oc. Spoke to Kaleb Jones with Performance engineers, he noted that 4ft. verts in this area only is ok. Kaleb to send me new deatl with his stamp showing this.
|
BLD-Footing | 8/2/2018 | 8/2/2018 | 8/2/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|