BLD-Final | 8/19/2019 | 8/20/2019 | 8/20/2019 | P | PASS |
Tony Young
|
|
|
Inspection requested via web by Petros Paflias
|
DOC - Permit Finaled | 8/20/2019 | 8/20/2019 | 8/20/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 8/19/2019 | 8/19/2019 | 8/19/2019 | P | PART |
Tell Riley
|
|
|
Inspection requested via web by Petros Paflias//need to install smoke and carbon monoxide detectors per plans//all other parts of permit are complete//
|
BLD-Final | 7/3/2019 | 7/8/2019 | 7/8/2019 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Petros Paflias. Needs electrical final first.
|
BLD-Conference | 7/3/2019 | 7/8/2019 | 7/3/2019 | A | CANC |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Petros Paflias Inspection cancelled from web by: Petros Paflias
|
BLD-Energy code compliance | 9/24/2018 | 9/24/2018 | 9/24/2018 | A | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 9/20/2018 | 9/24/2018 | 9/24/2018 | A | PASS |
Brandon Shaw
|
|
|
Air/foam seal needed...
OK to cover
|
BLD-Conference | 9/9/2018 | 9/11/2018 | 9/11/2018 | A | NR |
Mike Jordan
|
|
|
Wall Bracing and Framing Phone #: ###-#### Inspection requested via web by Petros Paflias. Will need to go back to plan review to show changes in exterior door and windows as well as approval for site built trusses.
|
BLD-Foundation | 7/23/2018 | 7/24/2018 | 7/24/2018 | A | PASS |
Tony Young
|
|
|
Forms will be set and ready for inspection. Plans are to pour concrete that afternoon after inspection. Phone #: ###-#### Inspection requested via web by Petros Paflias,, monolithic pour,, ok
|