BLD-Final | 7/24/2020 | 7/27/2020 | 7/27/2020 | A | PASS |
Mike Jordan
|
|
|
SCREENED // Kimbra Phone #: ###-####
|
DOC - Permit Finaled | 7/27/2020 | 7/27/2020 | 7/27/2020 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 7/23/2020 | 7/23/2020 | 7/23/2020 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
call for access- Kimbra *screened* Phone #: ###-####
|
FIRE-Conference | 7/21/2020 | 7/21/2020 | 7/21/2020 | P | DONE |
Troy Cobbley
|
|
|
We went over life safety requirements.
Kimbra ###-####
|
BLD-Final | 7/17/2020 | 7/17/2020 | 7/17/2020 | P | CANC |
Mike Jordan
|
|
|
Screened-Cliff Phone #: ###-####.
|
BLD-Conference | 12/2/2019 | 12/2/2019 | 12/2/2019 | P | PASS |
Mike Jordan
|
|
|
aDAM Phone #: ###-####
|
BLD-Wall Bracing | 11/27/2019 | 11/27/2019 | 11/27/2019 | P | PASS |
Mike Jordan
|
|
|
FIRE WALL // Adam Phone #: ###-####
|
BLD-Conference | 11/22/2019 | 11/22/2019 | 11/22/2019 | P | DONE |
Mike Jordan
|
|
|
Adam Phone #: ###-####
|
BLD-Framing/Rough-in | 10/14/2019 | 10/15/2019 | 10/15/2019 | P | PASS |
Mike Jordan
|
|
|
Kimbra Phone #: ###-####. Observed install of 3 1/2 inch all thread rods epoxied into concrete footing. All holes were blown clean and brushed. All work was done per the engineers RFI and manufactures instructions.
|
BLD-Conference | 9/18/2019 | 9/19/2019 | 9/19/2019 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Conference | 9/17/2019 | 9/18/2019 | 9/18/2019 | P | DONE |
Mike Jordan
|
|
|
Call ahead 20 minutes - foundation poured in wrong spot - need advice // Kimbra Phone #: ###-####
|
BLD-Concrete | 8/20/2019 | 8/22/2019 | 8/22/2019 | P | PASS |
Mike Jordan
|
|
|
after 2pm // Doug Phone #: ###-####. Welded wire mesh for slab on grade ok.
|
BLD-Concrete | 8/5/2019 | 8/6/2019 | 8/6/2019 | P | PASS |
Mike Jordan
|
|
|
rebar- after 2:30pm please- Doug Phone #: ###-####. Ties replaced. ok.
|
BLD-Foundation | 8/6/2019 | 8/6/2019 | 8/6/2019 | P | PASS |
Mike Jordan
|
|
|
rebar- after 2:30pm please- Doug Phone #: ###-####
|
BLD-Footing | 7/19/2019 | 7/23/2019 | 7/23/2019 | P | CANC |
Mike Jordan
|
|
|
rebar - after 2 pm // Doug Phone #: ###-####
|
BLD-Foundation | 7/23/2019 | 7/23/2019 | 7/23/2019 | P | FAIL |
Mike Jordan
|
|
|
rebar - after 2 pm // Doug Phone #: ###-####. Hairpins not installed around anchor bolts. #3 ties do not conform to ACI standards. Ties are not continous and missing hooks. Contractor noted that this rebar was donated. Noted to contractor that the ties still need to meet ACI.
|
BLD-Foundation | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | PASS |
Mike Jordan
|
|
|
Doug - after 2pm Phone #: ###-####. Footings ok. City approved plans on site. Noted that building pad appears to be built up 3/4 inch road mix. Footings appear to be on undisturb native soils. Called and have left message with owner, Micheal Moore, to call me back to discuss pad and if compaction testing was completed.
|
BLD-Concrete | 7/1/2019 | 7/3/2019 | 7/3/2019 | P | NR |
Mike Jordan
|
|
|
late afternoon - rebar // Doug Phone #: ###-####. Needs to provide the city set of approved plans. Also noted to concrete contractor that special inspection is required.
|