BLD-Final | 2/20/2019 | 2/22/2019 | 2/22/2019 | A | PASS |
Tony Young
|
|
|
josiah Phone #: ###-#### please call when on way,, exterior deck is not in so doors are blocked off on lower 4',, egress is still functional
|
DOC - Permit Finaled | 2/22/2019 | 2/22/2019 | 2/22/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Energy code compliance | 11/29/2018 | 11/30/2018 | 11/30/2018 | P | PASS |
Tony Young
|
|
|
Jesiah-would like after 3 PM if possible Phone #: ###-####
|
BLD-Framing/Rough-in | 11/27/2018 | 11/30/2018 | 11/30/2018 | P | PASS |
Tony Young
|
|
|
Josiah Phone #: ###-####-would like after 3 pm
|
BLD-Framing/Rough-in | 11/26/2018 | 11/29/2018 | 11/29/2018 | A | PART |
Dave Hannah
|
|
|
Jesiah Phone #: ###-#### ok to insulate check fire blockingin basement at energy inspection
|
BLD-Energy code compliance | 11/26/2018 | 11/29/2018 | 11/29/2018 | A | PART |
Dave Hannah
|
|
|
Jesiah Phone #: ###-#### air seal ok
|
BLD-Wall Bracing | 10/18/2018 | 10/19/2018 | 10/19/2018 | A | PASS |
Tony Young
|
|
|
shear // Jeff Phone #: ###-####
|
BLD-Foundation | 9/10/2018 | 9/10/2018 | 9/10/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Wall cover | 9/7/2018 | 9/10/2018 | 9/10/2018 | A | CANC |
Brandon Shaw
|
|
|
edgar Phone #: ###-####
|
BLD-Footing | 8/30/2018 | 8/31/2018 | 8/31/2018 | A | PASS |
Tony Young
|
|
|
Edgar Phone #: ###-####,, basement footing ok
|
BLD-Footing | 8/30/2018 | 8/30/2018 | 8/30/2018 | P | PART |
Tony Young
|
|
|
Edgar ###-####,, work in progress,, ok
|